BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in John Day, Oregon. Contact the soliciting agency for additional information.

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. DESCRIPTION OF REQUIREMENT This solicitation is for trail maintenance to be performed within the Strawberry Mountain and Monument Rock Wilderness areas in the Malheur National Forest. Four primary line items involve logout and brushing of four wilderness trail segments. Four optional line items involve maintaining the same four wilderness trail segments to USFS standards. The Contractor shall furnish the necessary personnel, supervision, material, equipment, facilities, services, supplies, travel, transportation, training, and incidentals to perform deferred trail maintenance. The four primary line items require logout and brushing on the trail segments based on USFS standards (Reference Exhibits 1-7). This includes all downed and leaning trees, brushing of woody type vegetation encroaching on the trail corridor, and general clearing of debris from trail beds. Brushing is 4 feet from centerline of trail, 10 feet high. Clearing of down logs is the same, in addition to hazard trees. Cut staubs to avoid safety concerns - where possible cut to ground level. Wilderness horse and hiker trails shall be cleared to standard trail clearing specifications. There are no special project specification. Four optional line items complete remaining deferred maintenance to bring these trails up to USFS maintenance standards. Included in this work is minor slide repair and trail tread sluff, tread widening and leveling where required, filling holes, stabilizing toe slopes as necessary, cleaning existing drainage structures (waterbars, turnpikes, culverts, ditches, etc.), and ford maintenance. The areas containing these four trails have all burned in the last twenty years. There are areas of heavy downfall and thick brush. The result of the work on this contract shall remove all woody vegetation (trees and brush) from the trail corridor, and optional line items shall bring the trail back to USFS standards, improve tread where needed, remove all obstacles, and allow for safe use of trails. All wilderness laws must be followed. Wilderness laws require the use of the "minimum tool necessary" to complete a project. This will require a contractor with specialized skills, including the ability to use crosscut saws and other traditional tools. Mechanized transport is not allowed, which includes but is not limited to the use of carts or wheelbarrows. Motors are prohibited in wilderness and all motorized tools are prohibited including battery operated drills, power saws, etc. Mechanical tools such as grip hoists are allowed. PLACE OF PERFORMANCE Period of Performance shall be on or before September 15th, 2022, to October 31st, 2023. PERIOD OF PERFORMANCE The trails to be maintained are the full extent of the Joaquin Miller Trail, segments of the Indian Creek and Mud Lake Trails, located in the Strawberry Mountain Wilderness, and a segment of the Little Malheur Trail, located in the Monument Rock Wilderness.

Post-Bid

Roads / Highways

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
12
All Active Projects
6
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

September 15, 2022

img_map_placeholder

Multiple Locations, John Day, OR


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.