BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a civil project in Foster City, California. Completed plans call for the renovation of a water / sewer project; for site work for a road / highway; and for paving for a road / highway.

The work consists of: The installation of two (2) 10,000 gallon UL2085 Aboveground (AST) gasoline storage tanks on reinforced concrete foundation slab, access stair, two (2) dispensers, fuel management system (card reader), canopy over fueling area, concrete drive slab, and all associated electrical and piping systems. Installation one (1) 10,000 gallon UL2085 Aboveground (AST) diesel fuel storage tank on reinforced concrete foundation slab, access stair, one (1) dispenser, fuel management system (card reader), canopy over fueling area, fuel dispensing island, concrete drive slab, and all associated electrical and piping systems. This system will also serve as a fuel source for the existing standby generator and lagoon pumps IC engines. Install one (1) new 300 gallon day tank in lagoon pump station building. Removal of one (1) 210 gallon Aboveground (AST) diesel fuel day tank in lagoon pump station building. Removal of two (2) 5,000 gallon Aboveground (AST) diesel fuel tanks, open-topped vault and vault roof. Backfill vault and patch pave area. Removal of two (2) 10,000 gallon Underground (UST) gasoline storage tanks, fuel island with two (2) dispensers, and all associated electrical and piping systems. Backfill excavations and patch pave disturbed areas. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All work shall be completed within 135 calendar days for the date when the Contract Time commences to run, following the Procurement Period. Procurement period to run roughly 5 months. The Engineer's Opinion of Probable Costs is approximately $3,000,000 to $3,200,000 Owner specifically reserves the right, in its sole discretion, to reject any or all Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the work. Owner may reject any and all Bids and waive any minor irregularities in the Bids. at 100 Lincoln Centre Drive. This project scope is to install two (2) 10,000 gallon UL2085 fuel aboveground storage tanks (AST's), install one (1) 10,000 gallon UL2085 fuel aboveground storage tank (AST's), install one (1) new 300 gallon day tank, remove one (1) 210 gallon diesel fuel day tank, remove two (2) 5,000 gallon diesel aboveground storage tanks (AST's), remove two (2) 10,000 gallon underground storage tanks (USTs) gasoline storage tanks, fuel island with two (2) dispensers, and all associated electrical and piping systems. Backfill excavations and patch pave area. The work consists of: The installation of two (2) 10,000 gallon UL2085 Aboveground (AST) gasoline storage tanks on reinforced concrete foundation slab, access stair, two (2) dispensers, fuel management system (card reader), canopy over fueling area, concrete drive slab, and all associated electrical and piping systems. Installation one (1) 10,000 gallon UL2085 Aboveground (AST) diesel fuel storage tank on reinforced concrete foundation slab, access stair, one (1) dispenser, fuel management system (card reader), canopy over fueling area, fuel dispensing island, concrete drive slab, and all associated electrical and piping systems. This system will also serve as a fuel source for the existing standby generator and lagoon pumps IC engines. Install one (1) new 300 gallon day tank in lagoon pump station building. Removal of one (1) 210 gallon Aboveground (AST) diesel fuel day tank in lagoon pump station building. Removal of two (2) 5,000 gallon Aboveground (AST) diesel fuel tanks, open-topped vault and vault roof. Backfill vault and patch pave area. Removal of two (2) 10,000 gallon Underground (UST) gasoline storage tanks, fuel island with two (2) dispensers, and all associated electrical and piping systems. Backfill excavations and patch pave disturbed areas. Question Deadline 11/07/2024 Bidders must direct all questions about the meaning or intent of Bidding Documents to Owner in writing. Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by written Addenda mailed, faxed, or delivered to all parties recorded by Owner as having received Bidding Documents. Owner may not answer questions received less than seven (7) days prior to the date for opening Bids. B. Only questions answered by formal written Addenda will be binding. Any other interpretations or clarifications will be without legal effect, and Bidders shall not rely on oral statements

GC Bidding

Water / Sewer

$3,200,000.00

Public - City

Paving, Renovation, Site Work

31

16

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
86
Bidding Soon
1,746
All Active Projects
728
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

January 13, 2025

img_map_placeholder

100 Lincoln Centre Dr, Foster City, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.