BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Snohomish, Washington. Completed plans call for site work for a water / sewer project.

This project has been awarded to D & G Backhoe, Inc., in the amount of $790,401. ** Request for Proposal No. 22-1314-KS PWC - 2022 Capital Improvement 123rd Ave. SE & 57th Pl. SE Water Main Replacement Each bid must be accompanied by proof of bid security which guarantees the amount of 5 percent (5%) of the total amount bid, excluding tax. This project provides all labor, equipment, tools, goods, material and incidentals necessary to install approximately 2,840 lineal feet of eight-inch, approximately 70 lineal feet of six-inch, approximately 900 lineal feet of four-inch and approximately 20 lineal feet of three-inch ductile iron water main and associated fittings; 3 new fire hydrant assemblies, the replacement of an existing concrete vault lid to match current PUD standards and appurtenances. The project also includes installation of 49 water services, removal of existing valving, asphalt trench patching, asphalt restoration overlay, private asphalt, concrete and gravel driveway and erosion control and landscape/surface restoration. The primary purpose of the proposed project is to replace aging water system infrastructure. Construction shall be performed while maintaining service to the existing water system. The project location is on and in the vicinity of 123rd Ave. SE and 57th Pl. SE, near the City of Snohomish, in Snohomish County, Washington. The District encourages minority and women's business enterprises to request these contract documents and to bid on this work.

Award

Water / Sewer

$790,401.00

Public - County

Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
49
Bidding Soon
922
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2022

September 19, 2022

img_map_placeholder

123rd Ave SE & 57th Pl SE, Snohomish, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.