BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Mellette, South Dakota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Bids are invited upon the items and approximate quantities of work as follows: Base Bid Approximately: 61 CuYd of Unclassified Excavation, 55 S.F. of Remove and Dispose of Asphalt Surfacing, 75 Ft of Remove and Dispose of CMP Culvert, 110 Ft of Saw Cut Full Depth Existing Surfacing, 50.0 Ton of Granular Base Course, 1,050 Ton of Asphalt Concrete Surfacing (PG 64-22), 0.2 Ton of Bituminous Tack Coat, 505 S.F. of 6" Reinforced Concrete Valley Gutter, and other miscellaneous items of related construction. The approximate quantities mentioned above are subject to increase or decrease. It will be agreed by bidders that all quantities of work will be performed in accordance with the provisions of the plans and specifications and at the unit price bid. Bidders agree to furnish all labor, material, and equipment necessary to complete all the work as shown in the plans and specifications. The complete set of Contract Documents, including 11" x 17" paper drawings and specifications, is on file with the City of Mellette or at the office of Helms and Associates, 416 Production Street N., Aberdeen, South Dakota 57401. Copies of the Contract Documents may be obtained from the office of Helms and Associates, PO Box 111, Aberdeen, SD 57402. Additionally, upon request, in accordance with South Dakota Codified Law 5-18B-1, one copy of Plans and Specifications shall be furnished, without charge, to each Contractor resident in South Dakota who intends, in good faith, to bid upon the project. Each bid must be accompanied by a certified check or bank draft payable to the order of the City of Mellette; or negotiable U.S. Government Bonds (at par value) in an amount equal to five percent (5%) of the total bid. A bid bond in an amount equal to ten percent (10%) of the total bid will be accepted in lieu of a certified check or bank draft. Surety for bid bond must be authorized to do business in the State of South Dakota. Bids may be held by the City of Mellette; for a period of not more than thirty (30) days from the date of opening of bids for the purpose of reviewing the bids, investigating the qualifications of the bidders and completing financial arrangements prior to awarding the Work. The Owner reserves the right to reject any or all bids and to waive any informality in the bidding.

Award

Roads / Highways

$185,888.00

Public - City

Paving, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
5
Bidding Soon
57
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2022

September 15, 2022

img_map_placeholder

Mellette Dr, Mellette, SD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.