BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Peoria, Illinois. Contact the soliciting agency for additional information.

ob No. P-94-017-22, Various Phase I/II Engineering Projects, Various Routes, Various Counties, Region Three/District Four This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 26, 2022, at 9:00 AM at the Region Three/District Four Office in Peoria Phase I/II engineering services are required for work on various projects throughout District Four. Work Orders under the blanket agreement will be negotiated and authorized by the department on an as-needed basis. Phase I work, if required, may consist of conducting route surveys, land surveys, hydraulic surveys, hydraulic analyses, geometric analyses, environmental studies, preparing Bridge Condition Reports, Hydraulic Reports, Structure Geotechnical Reports, Type, Size, and Location (TS&L) plans, Intersection Design Studies (IDS's), and Project Reports (categorical exclusion projects only). This work may include data collection, development of alignment alternatives, cost estimates, traffic management analyses, traffic management plans, crash analyses, geometric studies, traffic studies, drainage studies, structure borings, geotechnical analysis and reporting, analysis of existing pavements including obtaining pavement cores, and all other related work required to produce the necessary Phase I documents and reports. Phase II work, if required, may consist of conducting route surveys, land surveys, hydraulic analyses, structure plans, roadway plans, drainage plans, geometric plans, geotechnical analyses, and reporting, drilling and analysis of soil borings, traffic signal plans, traffic staging plans, temporary and permanent erosion control plans, plats and legal descriptions for Right-of- Way acquisition, and any other related work required to complete plans, specifications and estimates as necessary. The estimated engineering fee for this project is $1,500,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firms must be prequalified in the following categories to be considered for this project: Structures (Highway: Typical) Highways (Roads and Streets) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 027 RFQ - Phase II District Wide Pavement and Bridge Preservation Projects, Various Routes *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Design

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
45
Bidding Soon
591
All Active Projects
251
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2023

img_map_placeholder

Multiple Locations, Peoria, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.