BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Moline, Illinois. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Job No. V-92-001-23, Phase I and II Engineering Services, I-39 over I-88 Bridge Rehabilitation and Removal and Replacement of Culverts on IL 64, Ogle County, Region Two/District Two. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on November 1, 2022, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase I and II engineering services are required for preparation of multiple Phase I design reports (anticipated to be categorical exclusions) and the preparation for contract plans for seven structures. The first set of structures involves rehabilitation of the twin structures that carry I-39 over I-88 in Rochelle. This project also includes the removal and replacement of five culverts carrying IL 64 over drainage ditches as follows: 0.6 Mi West of Chana Rd, 0.4 Mi. East of Chana Rd, 0.40 M. E. of IL 251, 0.49 M. E. of I-39 and 0.38 M. W. of Chamberlain Rd. The department will complete the bridge borings for the structures, but SGRs will be completed by the Consultant. The preparation of the Bridge Condition Reports (BCRs) will be required for each of the structures. Phase I may include the preparation of multiple Project Reports, Traffic Management Analysis (TMA), review and or preparing of Bridge Condition Reports (BCR), crash analysis, Type, Size and Location (TSL) drawings, cost estimates, pavement design, cross sections, and typical sections, geotechnical engineering services, SGRs, environmental coordination, PESA. Coordination with Illinois Tollway and other agencies is anticipated with this project Phase II may include the preparation of detailed contract plans and all associated material, TSL drawings, structure plans, roadway plans, typical sections, drainage plans, erosion control plans, cross sections, special details, special provisions; quantities, cost estimates, estimate of time, Maintenance of Traffic (MOT), preparing PESA Response submittals, the preparation of SGRs and all other incidental work required to complete the project. Coordination with the Illinois Tollway other agencies is anticipated with this project. The completion date for this contract will be 48 months after authorization to proceed. The Phase I portion is expected to be completed in 24 months and the Phase II portion is expected to be completed in 24 months. A planned Supplement for Phase II will be done near the completion of Phase I. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 016 - RFQ - Phase I and II Engineering Services, I-39 over I-88 Bridge Rehabilitation and Removal and Replacement of Culverts

Design

Bridges / Tunnels

$800,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
52
Bidding Soon
1,074
All Active Projects
433
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 25, 2023

August 25, 2027

img_map_placeholder

I-74, Moline, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.