BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2022 at 8:00 PM

Updated September 15, 2023

Site work and renovation of a mixed-use development in New Castle, Delaware. Completed plans call for the renovation of a transportation facility; and for site work for a water / sewer project.

The Project work generally consists of, but is not limited to, the furnishing of all labor and materials required for installation of concrete manholes, sanitary plumbing, concrete excavation and repair, sanitary grinder pump procurement and install, concrete bollard placement, and electrical work, as necessary. It is the intent of the Authority to authorize the Contractor to proceed with the work on or about December 1, 2022. All work on the project must be completed within Thirty (30) calendar days

Bid Results

Transportation Terminals

$265,000.00

Public - State/Provincial

Renovation, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
678
Active Projects
352
Bidding Soon
4,042
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

December 1, 2022

Project location map

151 N Dupont Hwy, New Castle, DE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.