Renovation of a water / sewer project in Springfield, Oregon. Completed plans call for the renovation of a water / sewer project.
Contemplated work consists of furnishing all labor and equipment necessary for the following work: Flipping the old and new sand through the trench method shown in Exhibit-A. This method is use in order to not place undue equipment pressures on the existing filter bed. Excavate/shovel and dispose of the dirty sand from edges of the liner of the Filter Bed #4 at an area designated onsite (take extra care not to damage liner, any damage SUB will back charge the contractor to have a certified liner contractor repair). Remove/move approximately 14-Inches of existing sand from the bottom of the filter in trench/rows (leave 4-inchs of existing sand in place to avoid the gravel media under the sand). Installing approximately 18-Inches of new sand from the sand storage area. Cap the new sand with a 14-Inch layer of the removed/moved existing sand. The top of the sand layer must be a uniform density and elevation so that the filter cleaning machine can operate on the surface. The top of the finished media shall be flat to within a tolerance of plus or minus 0.04 feet of the average elevation. Steel Tracks equipment is not allowed within the filter bed area due to the bed liner system. All equipment shall be steam cleaned and leak free prior to being mobilized onsite. Equipment needs food grade fluids for the hydraulics, coolant, grease, to access filter beds for placement of the sand media (preferred products BioFlo HEES 46, AMSOIL Propylene Glycol, TruGrease FG AP 2 or prior engineered approval). No proposal will be considered by the Springfield Utility Board unless the Bidder agrees to be bound by and will comply with the provisions of ORS 279C.800 to 279C.870 and 40 U.S.C. 276(a) pertaining to prevailing wages, as applicable. Each bid must contain a statement as to whether or not the bidder is a resident bidder as defined in ORS 279A.120. Each bid must also contain a statement as to whether the bidder is registered with the Oregon Construction Contractors Board. No bid will be received or considered unless the bidder is registered with the Construction Contractors Board, as required by ORS 701.035.ET.SEQ. Faxed copies will NOT be accepted. First-tier and other subcontractors must be accepted by Springfield Utility Board prior to the pre-construction meeting. Proposals must be submitted on the prescribed forms. The successful bidder will be required to furnish to Springfield Utility Board a performance bond and a payment bond each equal to one hundred percent (100%) of the amount of the bid. The successful bidder and all subcontractors will be required to furnish to the Oregon Construction Contractors Board a public works bond in the amount of $30,000, unless exempt under ORS 279C. Acceptance of bids and award of contract will follow procedures provided by ORS 279C and in accordance with all applicable Springfield Utility Board policies. Springfield Utility Board reserves the right to reject any and all bids, to waive any irregularities, and to accept the bid deemed in the best interests of Springfield Utility Board. Springfield Utility Board may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the agency it is in the public interest to do so.
Award
Water / Sewer
$124,980.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 16, 2022
October 17, 2022
1295 S 26th St, Springfield, OR
Related To This Project
Springfield, OR
Bid Date: Aug 25 2022
Springfield, OR
Bid Date: Aug 09 2022
Springfield, OR
Bid Date: Jul 20 2022
Springfield, OR
Bid Date: Sep 22 2022
Springfield, OR
Bid Date: Mar 18 2022
Springfield, OR
Bid Date: Oct 04 2022
Springfield, OR
Bid Date: Dec 21 2022
Springfield, OR
Bid Date: Oct 19 2023
Springfield, OR
--
Springfield, OR
Bid Date: Aug 03 2022
Springfield, OR
Bid Date: Jul 07 2022
Springfield, OR
Bid Date: Jul 07 2022
Springfield, OR
Bid Date: Jun 14 2022
Springfield, OR
--
Springfield, OR
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.