Site work and paving for a civil project in Springfield, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Springfield Utility Board (SUB) seeks a contractor to install underground facilities consisting of one (1) threeinch (3") conduit for new underground electric distribution cable for the entire length of the project and two (2) two-inch (2") conduits for a section of the project. The work will consist of directional boring and trenching at 2686 & 2667 Viewmont Avenue and a vault installation at 2667 Viewmont Avenue. Trench approximately 40 feet of one (1) two-inch (2") conduit between junction box at 2686 Viewmont Avenue and meterbase at 2686 Viewmont Avenue. Bore approximately 50 feet of one (1) three-inch (3") conduit between junction box at 2686 Viewmont Avenue and junction box at 2580 Viewmont Avenue. Sweep up at each junction box. Trench approximately 20 feet of two (2) three-inch (3") conduit from junction box at 2686 Viewmont Avenue Southeast to road crossing across from new vault 22A016 location. Cap and mark one (1) conduit. Sweep one (1) conduit under water and gas line to connect to old vault 94N108. Bore approximately 50 feet of two (2) three-inch (3") conduits across Viewmont Avenue. Sweep one (1) conduit into old vault 94N108. Install one (1) conduit directly into new vault 22A016 and extend this conduit at 2686 Viewmont Avenue past the gas and water line then cap and mark. Install new 4'x 4' Vault # 22A016 at 2667 Viewmont Avenue. Trench approximately 5 feet of one (1) three-inch (3") conduit between new vault 22A016 and old vault 94N108. Bore approximately 40 feet of one (1) two-inch (2") conduit from new vault 22A016 to the Northeast corner of 2629 Viewmont Avenue. Sweep up within two feet (2') from front of garage. Bore approximately 40 feet of one (1) two-inch (2") conduit from new vault 22A016 to the Northwest corner of 2667 Viewmont Avenue. Sweep up near existing meter base. Bore approximately 80 feet of one (1) three-inch (3") conduit between new vault 22A016 and junction box at 2581 Viewmont Avenue. Sweep up at junction box. Bore approximately 80 feet of one (1) three-inch conduit between new vault 22A016 and junction box at 2673 Viewmont Avenue. Sweep up at junction box. Conduits are to be installed per SUB specifications. Contractor shall restore any disturbed landscaping and asphalt/concrete to original condition or better. Contractor is responsible for requesting underground utility locates, private locates and is responsible for pot holing as necessary. Contractor Shall Supply 3" conduit, PVC schedule 40, Gray 2" conduit, PVC schedule 40, Gray 3" Poly, 3" nominal size, (HDPE), SDR 13.5, ATSM F2160, Gray 2" Poly, 2" nominal size, (HDPE), SDR 13.5, ATSM F2160, Gray 3" PVC-POLY Coupler, Dura-Line 3" SHUR-LOCK II, 20000173 2" PVC-POLY Coupler, Dura-Line 2" SHUR-LOCK II, 20000123 3" 90 degree sweeps, 36" radius - PVC schedule 40, Gray 3" 45 degree sweeps, 36" radius - PVC schedule 40, Gray 2" 90 degree sweeps, 36" radius - PVC schedule 40, Gray 2" 45 degree sweeps, 36" radius - PVC schedule 40, Gray 1,250 lb. rated mule tape End Bells - PVC schedule 40, Gray Glue for conduit and pipe Fill dirt and mulch if needed Asphalt repair as needed Landscape restoration Working hours are to be Monday-Friday, 7:00 a.m. to 4:30 p.m., no holidays or weekends. Work to be completed by October 5th, 2022 or sooner. If this completion date could not be met, please provide a proposed completion date on bid form. Project Point of Contact: Dan Norland, 541-744-3784 Cell, 541-735-0377 Office dann@subutil.com Bid Questions: Sandi Weston, 541-744-3706 Office, sandiw@subutil.com

Bid Results

Water / Sewer

$33,333.00

Public - City

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
14
Bidding Soon
180
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2022

September 26, 2022

img_map_placeholder

Viewmont Ave, Springfield, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.