BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a mixed-use development in Santa Paula, California. Completed plans call for the construction of a laboratory facility.

Plans call for the construction of a 1,000 square foot CMU building that will house a laboratory and office space next to the upper fuel farm facility. Trades Involved Include: Site Grading, BMP's, Underground Utilities, Concrete, Masonry, Structural Steel, Metal Decking, Roof Access Ladder, Mics Metals, Cabinets and Counter tops, Roofing, Gutters/Downspouts, Insulation, Doors/Frames, Interior Windows, metal Studs and Drywall, Soft Flooring, Ceramic flooring and wall tile, Painting, Suspended Ceilings, Bathroom Accessories, Signage, Plumbing, Mechanical, DDC, Electrical, Fire Alarm/MNS, Fire Suppression, Phone/DATA, Asphalt Paving, Landscaping, Site Concrete, and others. Addendum #1-#11 have been issued as of 10-13-2022. Note from Pacific West Builders: Pacific West Builders Will pay all costs associated with barge transportation. Air Transportation to and from the island will be paid for by the Government leaving/arriving out of Naval Base Ventura County, Point Mugu. Pacific West Builders will pay for all lodging and Meals in addition we will provide a shuttle for the workers. All on island fuel purchases will be paid for by Pacific West Builders. We will have for general use on island an all-terrain reach forklift, Flat bed material truck, 12' utility Trailer, shuttle bus, and a skip loader. The equipment will be utilized by all trades to assist in the transportation of material from the barge to the work site. The trades will be responsible for loading and unloading all materials from the barge and transporting them to the work site please be sure to account for the manpower to achieve this. Small loads that have been previously discussed can be unloaded by Pacific West Builders and transported to the work site however this would not include structural steel, masonry block, steel studs/drywall, concrete, or heavy equipment. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com.

Post-Bid

Laboratories

$500,000.00

Public - Federal

New Construction, Site Work

3

20

38

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
69
Bidding Soon
1,713
All Active Projects
732
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2022

November 10, 2022

img_map_placeholder

To Be Determined, Santa Paula, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.