Published September 15, 2022 at 8:00 PM

Updated October 9, 2024

Demolition, site work, paving and new construction of a civil project in Groveland, Massachusetts. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project No.21.211.NH The Town of Groveland invites sealed bids from general contractors for the replacement of the Johnson Creek Bridge on Uptack Road, located in Groveland, MA in accordance with the documents prepared by The Engineering Corp. The scope of work includes demolition and replacement of the existing culvert with a 3-sided precast concrete box culvert (9ft wide x 8.4' high) supported on precast concrete spread footings. There will be adjacent precast headwalls and cast-in-place wingwalls at each end of the proposed culvert. MassDOT prequalification of Contractors with the class of work as, BRIDGE - CULVERTS, for the project with an estimated value of $721,852.50 will be required. Bid security in the form of a bid bond, cash, certified check, or treasurer's or cashier's check payable to The Town of Groveland is required in the amount of five (5%) percent of the bid, in accordance with the bid documents.The Town of Groveland reserves the right to reject any or all bids or take whatever action is in the best interest of the Town The existing culvert carrying Uptack Road over Johnson Creek in Groveland, MA will be demolished and replaced with a 3-sided precast concrete box culvert supported on precast concrete spread footings. There will be adjacent precast headwalls and cast-in-place wingwalls at each end of the proposed culvert. The proposed culvert, spread footings, and headwalls shall be contractor designed in accordance with these special provisions. There will be new S3-TL4 bridge rail installed over the culvert with guardrail and transition to bridge rail at all four bridge approaches with compliant end treatments, as required. The road will be closed during construction and the contractor shall be responsible for providing all necessary signage and barricades required by the temporary traffic control Plans. The work to be done under this contract includes all design, equipment, materials, labor, and incidentals required to complete all work shown on the Plans.

Award

Bridges / Tunnels

$721,852.00

Public - City

Demolition, New Construction, Paving, Site Work

20

7

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
265
Bidding Soon
3,777
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

October 3, 2022

Project location map

Uptack Rd, Groveland, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.