Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in North Port, Florida. Contact the soliciting agency for additional information.
Scope of Services: The scope of work is a general guide to the work the City expects to be performed by the Consultant and is not a complete listing of all services that may be required or desired. The engineering services include Construction, Engineering, and Inspection services related to the Diesel Bypass Pump Installation and Inflow and Infiltration Mitigation Projects. Project Description: The City of North Port has received two Community Development Block Grants, one for the installation of eight diesel bypass pumps at lift stations and one for inflow and infiltration mitigation projects. The City anticipates that it will use existing City standard specifications and details for both projects including the bidding documents. This RFP is to request proposals from experienced and qualified firms for professional Construction, Engineering and Inspection (CEI) services for the two projects identified above. The intent of this RFP is to invite Engineering firms to provide proposals for the Construction, Engineering, and Inspection (CEI) services required for the Diesel Bypass Pump Installation and Inflow and Infiltration Mitigation construction projects. Proposers are welcome to visit existing lift stations that have diesel bypass pumps to see the type of installation envisioned. The inflow and infiltration mitigation work is anticipated to include cure-in-place lining, manhole rehabilitation and lining and miscellaneous other repairs as necessary. The City's technical specifications for all the items above can be found on the City's website. 1) Project Requirements: This work shall include the following Construction, Engineering, and Inspection services (CEI): Management of the construction contract related to the Diesel Bypass Pump Installation and Inflow and Infiltration Mitigation. It is anticipated that there will be two different construction contracts, one for each project, however, only one CEI firm for both projects. a. Shop drawing reviews including Maintenance of Traffic plans b. Respond to Request for Information (RFI) from the contractor and recommend resolutions to City of North Port c. Review/approval of material certifications d. Review/approval of construction test reports e. Conduct construction testing as required by the construction project specifications f. Construction Inspection and daily inspection reports, including photo documentation as needed. g. Conduct construction progress meetings and prepare/distribute associated minutes h. Conduct the pre-construction meeting and associated minutes i. In conjunction with City Staff, review/approve contractor invoices for payment, including a summary of work done in the invoice period j. In conjunction with City Staff, negotiate change order scope and costs k. In conjunction with City Staff, review and process contractor requests for contract time extensions l. In conjunction with City Staff, respond to project related citizen requests m. Notices to Contractor, if/as required, related to assessment of liquidated damages n. Perform any CEI reporting functions related to the individual grants including but not limited to Davis-Bacon, Section 3, Civil Rights and Equal Employment Opportunity compliance. The selected firm shall understand that time is of the essence for this project and shall complete the project on the in conjunction with the City and grant timeframes. Information provided in Part I, General Instructions, Paragraph 1, Purpose, Intent of RFP, is included in this Part II, Scope of Service, by reference. The method of contractor selection has not been determined at this time.
Conceptual
Water / Sewer
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2023
Multiple Locations, North Port, FL
Related To This Project
North Port, FL
Bid Date: Nov 08 2022
North Port, FL
Bid Date: Sep 15 2022
North Port, FL
Bid Date: May 05 2022
North Port, FL
Bid Date: Apr 21 2022
North Port, FL
Bid Date: May 02 2022
North Port, FL
Bid Date: Oct 26 2022
North Port, FL
Bid Date: Dec 09 2022
North Port, FL
Bid Date: Nov 03 2022
Callaway, FL
Bid Date: Oct 24 2022
Weston, FL
Bid Date: Nov 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.