BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Peoria, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of October 19 ,2022, project was awarded, construction of Reclaimed Water Segment 3 is expected to begin in late summer 2023 and be complete by fall 2024.** This project will include installation of a reclaimed waterline within the City of Peoria for the installation of Segment 3 Reclaimed Water Master Plan Implementation. The scope includes approximately 3,602 LF of 16-inch ductile iron pipe (DIP) reclaimed waterline along Jomax Road, from 101st Lane to Lake Pleasant Parkway, where it will tie into an existing 16 DIP potable main that is to be repurposed as a reclaimed waterline. Additionally, approximately 7,152 LF of 24-inch ductile iron pipe (DIP) is to be installed from the Citys existing Pleasant Valley Reservoir and Pump Station, located just to the west of Lake Pleasant Parkway and Lone Mountain Parkway intersection, up to an existing stub at the Paloma Community Park. The project will provide a reclaimed system backbone to prepare for future growth in the northern extents of the City and include, but is not limited to, piping, appurtenances, restoration and/or replacement of pavement, concrete improvements, and landscaping Questions Due Date: Sep 12th 2022, 5:00 PM MST In accordance with City of Peoria Procurement Code competitive sealed bids for the material or services specified will be received by the City of Peoria Materials Management until the date and time cited above. Bids received by the correct date and time shall be publicly opened and the bid price read. Bids shall be in the actual possession of the City of Peoria Materials Management on or prior to the exact date and time indicated above. Late bids will not be considered, except as provided in the City of Peoria Procurement Code.

Award

Water / Sewer

$7,534,148.00

Public - City

Paving, Site Work

37

8

2

10

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
21
Bidding Soon
702
All Active Projects
286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2022

October 31, 2022

img_map_placeholder

Multiple Locations, Peoria, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.