Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Bastrop, Texas. Completed plans call for site work for a sidewalk / parking lot; for the construction of a water / sewer project; water / sewer project; and for paving for a sidewalk / parking lot.
The project value listed reflects the total project estimate. After expiration of the time and date above first written, said sealed proposals will be opened to identify Proposer firms only and read according to State law. It is the sole responsibility of the Proposer to ensure that the proposal is in the hands of the designated person before the time and date above first written. It shall be each Proposer's sole responsibility to inspect the site of the work regarding the local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the proposal submitted. This contract is contingent upon permit approval from TCEQ. Neither the state of Texas, nor any of its departments, agencies, or employees are or will be a party to this invitation for bids or any resulting contract. The City of Bastrop is in the process of converting its water supply source from shallow alluvial wells primarily fed by the Colorado River to deep wells that draw from the Simsboro Aquifer; which will provide the City with a reliable, resilient, drinking water supply. This package is for the construction of the Filter and Chemical Buildings from the slab up. The project consists of the following: A new well field and production facilities Three additional wells are needed to meet Phase 1 flows, which consist of an average production capacity of 3 MGD and a peak capacity of 6 MGD. Water collection piping and access roads will be installed to each of the new wells. Groundwater treatment facilities Based on water quality sampling, a WTP primarily focusing on iron and manganese removal is needed. It will consist of chemical addition facilities housed in a chemical building and gravity filters housed in a filter building. Low Lift pump station Once treated, water will be pumped from the filter effluent to a 0.5 MG clearwell through the Low Lift pump station Ground Storage Tank (clearwell) 5 MG clearwell, Backwash pump station Backwash pumps will pull water from the clearwell and send it through the treatment plant to clean the filters Transmission piping - water will be conveyed through the 24-inch diameter, 21,500 lf transmission pipeline to GSTs at the Willow Site. Lift Station and Force Main A 21,500 lf wastewater forcemain will run along the same route as the transmission pipeline to convey wastewater generated during filter backwash and in the Filter Building to the City's wastewater collection system. Associated services Electrical and instrumentation Site development and access Various site improvements, paving, grading, fencing, landscaping.
Post-Bid
Water / Sewer
$35,000,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2022
November 14, 2022
To Be Determined, Bastrop, TX
Related To This Project
Bastrop, TX
Bid Date: Oct 07 2022
Bastrop, TX
Bid Date: Oct 06 2022
Bastrop, TX
--
Bastrop, TX
--
Bastrop, TX
--
Bastrop, TX
--
Bastrop, TX
--
Bastrop, TX
Bid Date: Jul 06 2022
Bastrop, TX
Bid Date: Oct 24 2022
Bastrop, TX
Bid Date: Jan 14 2022
Bastrop, TX
Bid Date: Oct 24 2022
Bastrop, TX
Bid Date: Oct 11 2022
Bastrop, TX
Bid Date: Oct 24 2022
Bastrop, TX
Bid Date: Oct 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.