Published September 29, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Christmas Valley, Oregon. Completed plans call for site work for a water / sewer project.

This project has been awarded to Timber Mountain Construction The First-Tier Subcontractor Disclosure Form, which is submitted separately, is required at 4:00 PM on September 7, 2022. The bids shall be mailed or delivered; fax or email transmissions will not be accepted. Generally, the work consists of installation of 8,329 lineal feet of 8" C900, 12,396 lineal feet of 6" C900, and 96 lineal feet of 4" C900, one bore, 13 fire hydrants, all necessary valves and fittings, generator installation, and other related work. Bidders must be prequalified. Bidders may submit by mail or deliver the Contractor's Pre-Qualification Form, which is included in the contract documents, or the State of Oregon Department of Administrative Services Pre-Qualification Application Form on or before August 31, 2022. Pre-qualifications can be e- mailed to carment@andersonengineering.com. This is a public works contract and no bid will be received or considered by the public contracting agency unless the bid contains a statement by the bidder, as part of their/his/her bid, stating the provisions of ORS 279.350 (Prevailing Wage Rates) are to be complied with. A copy of the Prevailing Wage Rate Statement is included in the contract documents. The Federal Labor Standards Provisions are also included in the Contract, and the Contractor is required to pay the higher of the two wage rates. No bids will be considered unless fully completed in the manner provided upon the bid form provided by the owner and accompanied by the bid bond or a certified check executed in favor of the owner in an amount not less than 5% of the total amount of the bid. Bid bond or check will be forfeited should the selected bidder neglect or refuse to enter into contract and provide suitable bond for faithful performance of the work. The successful bidder shall provide a performance bond, as hereinafter stipulated, for the full amount of the contract within 10 days after awarding of the contract, i.e. contract date. No bidder may withdraw or modify their bid after the hour set for the opening thereof until after the lapse 30 days from the bid opening. The owner reserves the right to reject any or all bids not in compliance with all prescribed bidding procedures and requirements and other applicable laws, and the owner may reject for good cause any or all bids upon the owner finding that it is in the public interest to do so. Owner may waive any informality in the bidding process. Bidders must be registered with the Oregon Construction Contractors Board.

Award

Water / Sewer

$1,543,856.00

Public - City

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Louvers and Vents, Vents
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
5
Bidding Soon
67
All Active Projects
26
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2022

November 14, 2022

img_map_placeholder

Multiple Locations, Christmas Valley, OR

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Water System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.