BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a swimming pool in West Orange, New Jersey. Completed plans call for site work for a swimming pool.

. Each Proposal will be made upon the prescribed forms furnished with the Specifications, and will be accompanied by a Bidder's Certified or Cashier's Check drawn on a solvent bank, in the sum of ten percent (10%) of the amount bid, but in no case in excess of Twenty Thousand Dollars ($20,000.00), or in lieu of a Certified or Cashier's Check, a Bid Bond in the same amount pre- pared on the form of Bid Bond attached hereto, duly executed by the Bidder as principal and having as surety thereon a Surety Company approved by the Township of West Orange. Such checks or Bid Bonds will be made payable to the Township of West Orange, and will be by it held as a guaranty that in the event the bid is accepted and a Contract awarded to the Bidder, the Contract will be duly executed, and its performance properly secured, and in default thereof, said check or Bid Bond and the amount represented thereby will be retained by the aforesaid Township of West Orange as liquidated damages. Proposals will be accompanied, in the case of corporations not chartered in New Jersey, by proper certificate that such corporation is authorized to do business in the State of New Jersey. Each Proposal will be enclosed in a sealed envelope bearing the name and address of the Bidder, will be addressed to the Township of West Orange and will be endorsed "Ginny Duenkel Pool Electrical Improvements". The Bidder to whom the Contract is awarded will be required to furnish a Performance Bond and a Payment Bond acceptable to the Township of West Orange, each in the amount of one hundred percent (100%) of the contract, in conformity with the requirements of the Contract Documents. In accordance with the requirements of the State of New Jersey Affirmative Action Program, Bidders are required to comply with the requirements of P.L. 1975, C127. The proposed work consists of but is not necessarily limited to the following improvements to the Township of West Orange outdoor Ginny Duenkel Pool, located at 60 1/2 Cherry St, West Orange, NJ 07052: Replacing six 120/208V panels and associated electrical wires and conduits as indicated on the Contract Design Drawings.

Award

Swimming Pools

$123,456.00

Public - City

Site Work

7

5

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
499
Active Projects
235
Bidding Soon
4,625
All Active Projects
2,130
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

December 11, 2023

img_map_placeholder

60 1/2 Cherry St, West Orange, NJ

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.