BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 6, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a sidewalk / parking lot in South Burlington, Vermont. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project consists of installing and upgrading signal equipment and minor sidewalk and curb repair along Dorset Street from the intersection with Williston Road to the intersection with Kennedy Drive. A bidder list will be maintained by Stantec, and the list, along with any addenda, will be provided to anyone who has received the plans. All requests for information regarding this project shall be made via email to Erik Alling, P.E., erik.alling@stantec.com (subject line: South Burlington STP SGNL(53) Signal Project Question) until Friday, September 9th at 4:00 pm. All bidders on this project shall be on the Agency of Transportation's prequalified list or shall have submitted a complete prequalification application to the Agency of Transportation, Contract Administration, a minimum of 10 working days prior to the bid opening. For information contact Jon Winter at 802-828-2643. The City of South Burlington reserves the right to reject any and all bids, to waive any technical or legal deficiencies and to accept any bid that it may deem to be in the best interest of the City. No bidder may withdraw his bid for a period of 90 days following the bid opening.

Award

Sidewalks / Parking Lot

$1,731,555.00

Public - City

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
109
Bidding Soon
1,976
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

October 17, 2022

Project location map

Dorset St, South Burlington, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.