BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Vancouver, Washington. Completed plans call for the renovation of a power facility.

*Contract Award Date: Sep 30, 2022 Contract Award Number: 70B01C22C00000136 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: J GRAY & ASSOCIATES, INC [UEI: D3ZNGF19KDB7],1891 Sycamore Lane,Fernandina Beach FL 32034 Contractor Awarded Address: Base and All Options Value (Total Contract Value): $67999.99 Project Description: The project includes the following work: Replacing the cooling tower fill material and drift eliminators in a GEC single row five (5) square cells control tower. Bid Guaranty: Bidder shall submit with its bid either an original surety company bid bond on the form provided by the Owner, or a cashiers or certified check payable to the order of Clark Public Utilities, in an amount not less than five percent (5%) of the total amount of the Bid that could be awarded including any Additives and Alternates and excluding sales tax. Bids not accompanied by an appropriate bid guaranty may be rejected as non-responsive. Questions: Questions about this project should be directed to the following individual. Depending on the nature of the question, the Utility may require the Bidder to put a question in writing. Contact Person/Title: Cathy Wannamaker, Materials Manager Phone Number: 360-992-8834 or via E-mail: cwannamaker@clarkpud.com Clark Public Utilities reserves the right to reject any or all bids, and to waive as an informality any immaterial irregularities in the bids received. The Work shall be commenced on the effective date specified in the Notice to Proceed (anticipated to be May 5, 2023) and shall be substantially complete no later than May 22, 2023. For failure to achieve Substantial Completion of the Work within the time provided, Contractor shall pay Owner $300.00 for each calendar day from the date when Substantial Completion should have been achieved to the date Substantial Completion is actually achieved. The Contractor must achieve Final Completion within (30) calendar days following the date Substantial Completion is actually achieved.

Award

Power Plant

$67,999.00

Public - County

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
31
Bidding Soon
572
All Active Projects
284
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

May 5, 2023

img_map_placeholder

5201 NW Lower River Rd, Vancouver, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.