EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Green Bay, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of March 25, 2025, this project is under construction. It will be completed in 3 stages: Stage 1 2025 (estimated end of March – June) CTH M/Lineville Rd intersection with Velp Ave (Railroad Crossing west of Velp Avenue to 50-ft west of the Kwik Trip Driveway): Traffic within this area will be closed to all thru traffic. • The Velp Avenue roundabout will be under construction and closed to thru traffic. • Access to Kwik Trip, Culvers, Festival Foods and all other businesses within the Urban Edge will be from driveway entrances located on CTH M/Lineville Rd and from the access on Velp Avenue by Pizza Hut. • A posted detour route will be setup and will utilize Cardinal Lane ? Woodale Avenue ? Cornell Road. Stage 1A 2025 (start after full completion of Stage 1; estimated June – July) 50-ft west of Kwik Trip Driveway to approximately 400-ft east of Festival roundabout: Traffic within this area will be closed to all thru traffic. • The Festival roundabout will be under construction and closed to thru traffic. • A new CTH M/Lineville Road entrance to Kwik Trip will be constructed and closed to thru traffic. • Access to Kwik Trip, Culvers, Festival Foods and all other businesses within the Urban Edge will be from the driveway entrance located on CTH M/Lineville Road by Cornell Road, and from all accesses on Velp Avenue. • A posted detour route will be setup and will utilize Velp Avenue ? Woodale Avenue ? Cornell Road. Stage 2 2025 (start after full completion of Stage 1A; July - November) Approximately 400-ft east of Festival roundabout to US 41: Traffic within this area will be closed to all thru traffic, except access to Sadoff Iron & Metal Company (located by Brookfield Ave intersection) will be maintained on CTH M/Lineville Rd. • A new roundabout will be built at Cornell Road and will be closed to thru traffic during construction. • Access to businesses within the Urban Edge will follow the detour route and will be from the entrances located on CTH M/Lineville Rd by Kwik Trip and Festival/Mini-mall roundabout, and from all accesses on Velp Avenue. • A posted detour route will be setup and will utilize Velp Avenue ? Woodale Avenue ? Lakeview Drive ? W Deerfield Avenue.

Under Construction

Roads / Highways

$9,581,485.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
30
Bidding Soon
422
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2025

img_map_placeholder

Multiple Locations, Green Bay, WI

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Reconstructing Part of Lineville Road Phase 2 - County of Brown

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.