BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 7, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a bridge / tunnel in Auburn, Washington. Working plans call for site work for a bridge / tunnel.

SUPPLEMENT this Section with the following: Remove drainage structures will be measured per each. Remove storm pipe will be measured per linear foot. SUPPLEMENT this Section with the following: "Remove Drainage Structure", per each. The unit price for "Removing Drainage Structure" shall include the cost of backfilling the void with gravel borrow. "Remove Storm Pipe", per linear foot. The unit price for "Removing Storm Pipe" shall include the cost of backfilling the void with gravel borrow. The Contractor shall furnish the City with an executed performance bond for the full Contract amount, unless the contact amount is $150,000.00 or less and the Contractor has elected to have 10% retainage held by the City, in which case a performance bond is not required for this project. The Contractor shall complete the work within 25 working days from the Notice to Proceed Date. A Notice to Proceed will be issued once the Contract has been fully executed by the Contractor and City, and all insurance and licensing requirements as set forth in the contract have been met. The Notice to Proceed Date shall be either the date the Contractor commenced contract work or the date the contract has been fully executed by the Contractor and City and all insurance and licensing requirements as set forth in the contract have been met, whichever occurs first. The Method of Contractor Selection has not been determined at this time. This contract was not formally bid because SMALL PUBLIC WORKS CONTRACT (MULTIPLE TRADE WORK): Engineer’s Estimate = $116,155.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Bridges / Tunnels

$300,000.00

Public - City

Site Work

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
79
Bidding Soon
1,106
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.