EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 18, 2022 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Ankeny, Iowa. Completed plans call for site work for a water / sewer project.

The project includes two divisions of work. Division I improvements include the installation of a 24-inch diameter water transmission main from the Ash Water Tower along the HTT Trail and NW 18th Street to the intersection of NW Irvinedale Drive and NW 18th Street. This work includes approximately 9,900 LF of 24-inch diameter transmission main constructed by trenched and trenchless methods, including related work such as water main connections, valves, hydrants, erosion control, surface restoration, and miscellaneous associated work. Division II work includes drainage channel improvements along NW 18th Street and the HTT Trail from NW Greenwood Street to NW 4th Street. This work includes approximately 2,600 feet of channel grading improvements, selected clearing and grubbing, debris and obstruction removal, channel and outlet stabilization, minor storm sewer and intakes, and associated work. Completion of Work: The Contractor shall fully complete Division I of the project within one hundred seventy (170) working days. The Contractor shall fully complete Division II of the project within ninety (90) working days.

Award

Water / Sewer

$5,778,405.00

Public - City

Site Work

62

8

2

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
27
Bidding Soon
475
All Active Projects
262
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2022

November 1, 2022

img_map_placeholder

Multiple Locations, Ankeny, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.