Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Tiffin, Ohio. Design plans call for site work for a water / sewer project.
As of July 10, 2024, an engineer has been selected and this project is in the design phase. It is anticipated bidding will commence in 2025 and construction will start for Phase 1. *The closed solicitation has been included below for reference: Engineering planning, design, and construction administration and inspection services for an Inflow Reduction Project within CSO Basins 9, 10, 11, 12, 13 and 15 as identified within the City of Tiffin s Integrated Long Term Control Plan Update dated January 31, 2017. The contract for this project will require the selected consultant to manage all facets of planning, design, and construction administration for this project including but not limited to boundary and topographic survey, CCTV, field investigation, smoke testing, preliminary and final plan and bidding specification preparation, permit preparation and construction administration and inspection services. The consultant will also be required to attend progress meetings during design and construction, assist in the management of the bidding process and attend any necessary pre-bid meetings, and answer any design related questions throughout both the bidding and construction of this project The City of Tiffin will authorize the consultant to begin design services by February of 2023. The project s current schedule requires the PTI for the project to be submitted to the Ohio EPA by June 2025 with construction beginning as soon as possible immediately thereafter approval. The City of Tiffin intends to apply for WPCLF funding for this project, thus, the project should be designed to comply with WPCLF program regulations. The City of Tiffin will directly select a consultant based upon the Letter of Interest (LOI), which should be no more than ten pages in length (not including the cover letter). Letters of Interest shall include the following: 1) Provide a list of the prequalifications obtained by the prime consultant 2) List significant subconsultants, their prequalification categories and the percentage of work to be completed by each subconsultant. 3) List the Project Manager and other key staff members, including key subconsultant staff. Include project engineers for important disciplines and staff members that will be responsible for the work, and the project responsibility of each. Address the experience of the key staff on similar projects. 4) Describe the capacity of your staff, and their ability to perform the work in a timely manner, relative to the present workload, and the availability of the assigned staff. 5) Provide a description of your Project Approach, not to exceed two pages in addition to the 10 page total. Questions should be directed to Matt Watson, P.E., P.S., CPESC City Engineer for the City of Tiffin. The Consultant Selection Rating Form can be obtained from the City Engineer by email at mwatson@tiffinohio.gov or by phone at 419-448-5425.
Design
Water / Sewer
$4,100,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2025
Multiple Locations, Tiffin, OH
Related To This Project
Tiffin, OH
Bid Date: Nov 09 2023
Tiffin, OH
Bid Date: Nov 13 2023
Tiffin, OH
--
Tiffin, OH
Bid Date: Jan 11 2024
Tiffin, OH
Bid Date: Jan 18 2024
Tiffin, OH
Bid Date: Oct 17 2018
Tiffin, OH
Bid Date: Jan 29 2019
Tiffin, OH
Bid Date: Jun 16 2021
Tiffin, OH
Bid Date: Jan 20 2022
Tiffin, OH
Bid Date: Jan 27 2022
Tiffin, OH
Bid Date: May 17 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.