EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 18, 2023 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Mt Pleasant Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The scope of work consists of the replacement of the structure carrying SR 2025 (Ankney Hill Road) over Welty Run. In addition, the approach roadway will be reconstructed approximately 100 feet on each side of the structure as well as updating the drainage, guide rail and signing and pavement marking as indicated on the approved drawings included in the bid package for STATE ROUTE 2025, SECTION G10, in WESTMORELAND COUNTY MOUNT TOWNSHIP. The project is located 2610 feet of the SR 0982 (Welty Rd)/SR 2025 (Ankney Hill Rd) intersection segment 0110/0998. Project Cost Range:$1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 47.00% Pre-Bid Meeting: none Wage Rates: yes Prequalification Requirement: yes State Type of Work: BRIDGE REPLACEMENT 408 Version: 2020-5 PADOT - Winter Operators 2022 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This work is the furnishing and installing of post-installed concrete anchors intended for attaching structural members/ components to existing and new concrete. These requirements apply to permanently installed anchors not under sustained tension loads, temporary applications under sustained tension loads as designed and installed by the contractor, and contractor's temporary shoring support systems that may include anchors under sustained tension loads. The requirements in this Section do not apply to anchors used for temporary concrete barriers, structure mounted, and anchors drilled in the downward direction.

Award

Bridges / Tunnels

$1,036,065.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

73

7

11

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Metal Decking
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Directories, Signage
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
52
Bidding Soon
880
All Active Projects
411
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2023

February 27, 2023

img_map_placeholder

State Rte 2025, Mt Pleasant Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

SR 2025 over Welty Run

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.