BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and new construction of a mixed-use development in Shafter, California. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; pre-engineered storage facility; and pre-engineered storage facility.

Supply & construct a pre-engineered steel shade structure within mannel park complete with structure, foundation, sidewalk, and a minor amount of electrical conduit. Project is funded by a grant from the national park service land and water conservation fund. Location- 600 Calloway Street in Shafter, California Project Duration: 133 Calendar Days Liquidated Damages: $1,000.00 Per Calendar Day Bid Bond Percentage: 10% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Shade Structure (materials) Shade Structure (construction) Clear & Grub site Subgrade preparation Foundation 680 sf Sidewalk 726 sf Electrical conduit Engineering Permitting Site surveying Materials testing & inspection project sign For further information, contact KEVIN HARMON, CITY ENGINEER at kharmon@shafter.com or (661) 746-5002.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$114,740.00

Public - City

New Construction, Paving, Site Work

10

6

2

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
20
Bidding Soon
387
All Active Projects
168
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2022

November 28, 2022

img_map_placeholder

600 Calloway St, Shafter, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.