BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Beaverton, Oregon. Completed plans call for the renovation of a educational facility; and 70,400-square-foot educational facility.

The purpose of this Invitation to Bid is to obtain competitive bids for retaining a General Contractor (GC) to furnish, install, manage, and coordinate all the work for the Fir Grove Elementary Roof. Deadline for submitting requests for clarification, change, substitution, or solicitation protest is October 31, 2022 - 4:00 PM PST PURPOSE AND INTRODUCTION: This solicitation is for retaining a general contractor (GC) to furnish, install, manage and coordinate all work as shown in the attached documents on behalf of the Beaverton School District. The goal is to recover the existing Tremco BUR system with a single ply. The project is over most of the building, including the attached covered play area but not the barrel roof section or detached covered play. 2. BACKGROUND AND SCHOOL DESCRIPTION: This project is going to take place at Fir Grove Elementary, 6300 SW Wilson Avenue, Beaverton, Oregon 97008. 3. OPERATIONAL ATTRIBUTES: The District requires the project to be completed by over the duration of the summer vacation beginning June 26, 2023. See project milestones below for further information. Coordination with summer maintenance activities will be required. 4. GENERAL SCOPE OF WORK: Please refer to attached plans and specifications. It is intended that the Contractor provides a complete project and coordinates work with the District, Contractors and Consultants hired by the District, and all applicable agencies having authority. a. Work to include supplying, storing, and handling of all required materials. b. Work includes protection of neighboring finishes and replacement/repair of any damaged surfaces including but not limited to ceiling tiles, wall board, paint, insulation, concrete block, etc. c. Contractor shall provide all labor, materials, equipment, transportation, and other facilities and services as necessary and/or required to execute all of the Work. d. All work areas shall be cleaned of any construction debris on a daily basis. General Contractor is responsible for material removal and disposal. Upon completion of the project, the General Contractor is to provide final cleaning of all work installed, replaced or repaired including jobsite office. e. Carefully review specification of Division 7 and be prepared to submit a Moisture Mitigation Plan as part of your initial submittals shortly after contract execution. f. Prepare to submit product data for all roofing materials within 10 days of a fully executed contract and provide proof of ordered material within 30 days after the fully executed contract. District is amenable to paying for materials or a portion of the materials upon confirmation of order. g. Carefully review all documents for the site. Below is only a summary of the work. i Fir Grove's work is to recover the existing Tremco BUR system with a single ply. The project is over most of the building, including the attached covered play area but not the barrel roof section or detached covered play.

Bid Results

Educational

$987,990.00

Public - City

Renovation

14

14

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
29
Bidding Soon
535
All Active Projects
228
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2022

June 26, 2023

img_map_placeholder

6300 SW Wilson Ave, Beaverton, OR

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.