Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Beaverton, Oregon. Completed plans call for the renovation of a educational facility; and 70,400-square-foot educational facility.
The purpose of this Invitation to Bid is to obtain competitive bids for retaining a General Contractor (GC) to furnish, install, manage, and coordinate all the work for the Fir Grove Elementary Roof. Deadline for submitting requests for clarification, change, substitution, or solicitation protest is October 31, 2022 - 4:00 PM PST PURPOSE AND INTRODUCTION: This solicitation is for retaining a general contractor (GC) to furnish, install, manage and coordinate all work as shown in the attached documents on behalf of the Beaverton School District. The goal is to recover the existing Tremco BUR system with a single ply. The project is over most of the building, including the attached covered play area but not the barrel roof section or detached covered play. 2. BACKGROUND AND SCHOOL DESCRIPTION: This project is going to take place at Fir Grove Elementary, 6300 SW Wilson Avenue, Beaverton, Oregon 97008. 3. OPERATIONAL ATTRIBUTES: The District requires the project to be completed by over the duration of the summer vacation beginning June 26, 2023. See project milestones below for further information. Coordination with summer maintenance activities will be required. 4. GENERAL SCOPE OF WORK: Please refer to attached plans and specifications. It is intended that the Contractor provides a complete project and coordinates work with the District, Contractors and Consultants hired by the District, and all applicable agencies having authority. a. Work to include supplying, storing, and handling of all required materials. b. Work includes protection of neighboring finishes and replacement/repair of any damaged surfaces including but not limited to ceiling tiles, wall board, paint, insulation, concrete block, etc. c. Contractor shall provide all labor, materials, equipment, transportation, and other facilities and services as necessary and/or required to execute all of the Work. d. All work areas shall be cleaned of any construction debris on a daily basis. General Contractor is responsible for material removal and disposal. Upon completion of the project, the General Contractor is to provide final cleaning of all work installed, replaced or repaired including jobsite office. e. Carefully review specification of Division 7 and be prepared to submit a Moisture Mitigation Plan as part of your initial submittals shortly after contract execution. f. Prepare to submit product data for all roofing materials within 10 days of a fully executed contract and provide proof of ordered material within 30 days after the fully executed contract. District is amenable to paying for materials or a portion of the materials upon confirmation of order. g. Carefully review all documents for the site. Below is only a summary of the work. i Fir Grove's work is to recover the existing Tremco BUR system with a single ply. The project is over most of the building, including the attached covered play area but not the barrel roof section or detached covered play.
Bid Results
Educational
$987,990.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 8, 2022
June 26, 2023
6300 SW Wilson Ave, Beaverton, OR
Related To This Project
Beaverton, OR
Bid Date: Oct 19 2022
Beaverton, OR
Bid Date: Oct 19 2022
Beaverton, OR
--
Beaverton, OR
Bid Date: Oct 20 2022
Beaverton, OR
Bid Date: Apr 03 2024
Beaverton, OR
Bid Date: Aug 18 2022
Beaverton, OR
Bid Date: Oct 05 2022
Beaverton, OR
Bid Date: Nov 15 2022
White City, OR
Bid Date: Nov 02 2022
La Grande, OR
Bid Date: Dec 22 2022
Lake Oswego, OR
Bid Date: Oct 19 2022
Forest Grove, OR
Bid Date: Oct 19 2022
Rivergrove, OR
Bid Date: Nov 09 2022
Sunriver, OR
Bid Date: Jun 01 2023
Salem, OR
Bid Date: Oct 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.