BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, outdoor lighting and new construction of a mixed-use development in Greenville, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; and for outdoor lighting for a sidewalk / parking lot.

Counties: Madison Road Name: SR 8 (I-10) Limits: AT PIDDLIN CREEK Project(s): 43205425201(*) Federal Aid No: D222029B Total Roadway Length: 0.314 Miles Contract Days: 500 Total Bridge Length: 0.014 Miles Total Proposal Length: 0.328 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Days The improvements under this contract consist of milling and resurfacing, base work, drainage grate replacement, curb and gutters, traffic and pedestrian signals, lighting for signalized pedestrian crosswalks, special bridge underdeck lighting, signing and pavement marking, bridge and retaining wall cleaning and coating, sidewalk replacement, new sidewalks, and other incidental construction on Edgewood Avenue South in Duval County from SR 15/US 17 Roosevelt to SR 111 (Cassat Ave). Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 003 - Bridge Replacement

Award

Bridges / Tunnels

$9,330,849.00

Public - State/Provincial

Demolition, New Construction, Outdoor Lighting, Paving, Site Work

174

5

6

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
25
Bidding Soon
356
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

January 16, 2023

img_map_placeholder

I-10, Greenville, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.