BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Central City, Colorado. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Gilpin County is seeking to have engineered plans developed for the construction of a new in-ground wet well pump station on the within county easements on the shore of Dory Lake. This wet well will tie into an existing pipeline and controls but replace the current submerged skid pump system as a long-term serviceable alternative. The existing pipeline to which the wet well and pumps will serve is designed to transfer water, when determined by the State Water Commission, out of Dory Lake and into nearby Ralston Creek to maintain obligations to senior water rights and use based (re) appropriations on Ralston Creek. All efforts must be made in design to minimize any aesthetic and functional disturbances to Dory Lake and it shores for the continued enjoyment of this feature of all nearby. Design must achieve zero impact on property values of private property in Dory Lake subdivision which may be contingent on the aesthetic and functional appeal of Dory Lake itself. Final design plans will need to achieve approval from a majority of stake holders as agreeable to qualify as zero negative impact. Assumed allowance by Gilpin County at this time for zero negative impact is to be: Upon project completion, a single visible in-ground man hole cover within county easement on the shore of Dory Lake for wet well access. Firms with experience in civil engineering, geotechnical investigations, bathymetric and topographic surveying, and wetlands regulations will be best suited for this project. A proposal to provide for the development of engineered plans, and a professional cost estimate will be required. Question Acceptance Deadline 11/16/2022 02:00 PM EST Questions are submitted online : No The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$300,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
38
Bidding Soon
1,001
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2022

img_map_placeholder

Multiple Locations, Central City, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.