BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Walnut, California. Completed plans call for the renovation of a educational facility.

Question Deadline 11/09/2022 at 2:00 PM PT Pre-bid RFI s are due electronically. Mt. San Antonio College of Los Angeles County, California, acting through its Governing Board of Trustees, hereinafter referred to as District, shall receive sealed bids for the award of a contract for the Athletics Modular Roof Replacement. Bids shall be valid for minimum of ninety (90) days after the Bid Deadline. Bids must be accompanied by cash, a certified or cashiers check, or a bid bond in favor of the Owner in an amount not less than ten percent (10%) of the submitted total bid price. The successful bidder will be required to furnish a performance bond and a payment bond, each in the amount of one hundred percent (100%) of the total bid price in the manner described in the Owner Documents. Bidders shall comply with California Public Contract Code Section 4108 with respect to subcontractor bond requirements. NOTE: Material lead times are six to nine months. Project is schedule to be completed during the summer break of 2023. DIR Registration. Each Bidder submitting a proposal to complete the work, labor, materials, and/or services ( Work ) subject to this procurement must be registered with the Department of Industrial Relations pursuant to Labor Code 1725.5. A Bidder who is not a DIR Registered Contractor when submitting a proposal for the Work is deemed not qualified and the proposal of such a Bidder will be rejected for non-responsiveness. Pursuant to Labor Code 1725.5, all Subcontractors identified in a Bidder s Subcontractors List shall also be DIR Registered Contractors. This project requires that the Contractor and any subcontractor(s) shall pay not less than the prevailing rates of wages to all workers employed by them in the execution of the contract. Copies of schedules of rates so determined are on file in the Purchasing Office and are available to any interested party upon request. Pursuant to Labor Code 1771.4(a)(4), Prevailing Wage Rate monitoring and enforcement shall be by the Department of Industrial Relations. In accordance with provisions of Public Contract Code Section 223000, substitution of eligible and equivalent securities for any monies withheld to ensure performance under this contract will be permitted at the request and expense of the Contractor. The District reserves the right: (1) to accept or reject any and all bids, (2) to waive any irregularities in the bids or bidding, (3) to be sole judge as to the merit, quality, and acceptability of materials proposed and their compliance to the specifications which in their opinion will best serve the interest of the District. Re-Roof Athletics building 44, by mechanically fastening Single Ply Thermoplastic (PVC) Roofing Membrane (Sarnafil) with flashings and other system components to comprise a roofing system. A Sarnafil roof is the District standard. Contractor MUST be certified to install Sarnafil roofing. NOTE: Material lead times are six to nine months. Project is schedule to be completed during the summer break of 2023.

Bid Results

Educational

$185,000.00

Public - State/Provincial

Renovation

8

13

5

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
224
Bidding Soon
3,681
All Active Projects
1,617
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 22, 2022

December 22, 2022

January 6, 2023

img_map_placeholder

1100 N Grand Ave, Walnut, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.