BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in The Dalles, Oregon. Completed plans call for site work for a road / highway; and water / sewer project.

The Project purpose is construct a new raw water intake with fish screening amenities at the existing Dog River diversion dam, remove an existing gaging weir, and replace the existing dam spillway with a rock ramp fishway to provide fish passage. The Project will also provide a connection to a newly constructed 30-inch Ductile Iron Pipe Size (DIPS) high density polyethylene pipe which is being constructed by others as part of the City of the Dalles Construction Contract Number 2022-001. The portions of the new 30-inch HDPE pipeline from the Dog River divaThe Project purpose is construct a new raw water intake with fish screening amenities at the existing Dog River diversion dam, remove an existing gaging weir, and replace the existing dam spillway with a rock ramp fishway to provide fish passage. The Project will also provide a connection to a newly constructed 30-inch Ductile Iron Pipe Size (DIPS) high density polyethylene pipe which is being constructed by others as part of the City of the Dalles Construction Contract Number 2022-001. The portions of the new 30-inch HDPE pipeline from the Dog River diversion dam to Forest Road 44 will be completed by November 2022. Certain pipe and appurtenances and boulders for the rock ramp fishway are Owner-furnished. Work of this Project includes maintenance of existing dirt and gravel roads and construction of stormwater and erosion control facilities. All construction is located on lands owned by the United States Forest Service (USFS), and the City operates under a Special Use Permit. Work will be constrained to comply with conditions of multiple permits including those issued by USFS, US Army Corps of Engineers, Oregon Division of State Lands, Oregon Department of Fish and Wildlife, Oregon State Historic Preservation Office, and Oregon Department of Environmental Quality. The Work will be completed in all respects on or before November 30, 2023. Questions regarding the Contract Documents should be directed to Dave Anderson, Public Works Director, via email at: danderson@ci.thedalles.or.us It is not anticipated that asbestos will be encountered during the Project. Each bid must contain a statement as to whether the proposer is a resident bidder as defined by ORS 279A.120. The Project will be funded using a combination of federal Safe Drinking Water Revolving Loan Funds, Oregon Water Project Grants as administered by the Oregon Water Resources Department (OWRD), and City water utility revenues. Accordingly, the Contract Documents will incorporate requirements of these funding programs including, but not limited to, the higher of Oregon state or federal prevailing wages to be paid, certified payroll requirements, good-faith efforts to engage disadvantaged businesses, methods of procurement, and American Iron and Steel requirements. All contractors entering into prime contract with City will be required to have a valid Unique Entity ID number and System of Award Management (SAM) registration. No Bid will be received or considered by Owner unless the Bid contains, or is accompanied by, a statement by Bidder that Bidder accepts prevailing wage rate provisions required by ORS279C.800- ORS279C.870 and 40 USC 276a. For information concerning the proposed Work, contact Dave Anderson, Public Works Director, (541) 506-2008 (office), (541) 980-1446 (cell). The construction site is expected to be inaccessible for wheeled motor vehicles during the bid period due to snowpack. Note that video of the pipeline corridor was obtained in Fall 2021 and has been made available via a link on the City webpage by clicking through the project title DOG RIVER PIPELINE PROJECTS. Owner's right is reserved to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents.ersion dam to Forest Road 44 will be completed by November 2022. Certain pipe and appurtenances and boulders for the rock ramp fishway are Owner-furnished. Work of this Project includes maintenance of existing dirt and gravel roads and construction of stormwater and erosion control facilities. All construction is located on lands owned by the United States Forest Service (USFS), and the City operates under a Special Use Permit. Work will be constrained to comply with conditions of multiple permits including those issued by USFS, US Army Corps of Engineers, Oregon Division of State Lands, Oregon Department of Fish and Wildlife, Oregon State Historic Preservation Office, and Oregon Department of Environmental Quality. The Work will be completed in all respects on or before November 30, 2023. Questions regarding the Contract Documents should be directed to Dave Anderson, Public Works Director, via email at: danderson@ci.thedalles.or.us It is not anticipated that asbestos will be encountered during the Project. Each bid must contain a statement as to whether the proposer is a resident bidder as defined by ORS 279A.120. The Project will be funded using a combination of federal Safe Drinking Water Revolving Loan Funds, Oregon Water Project Grants as administered by the Oregon Water Resources Department (OWRD), and City water utility revenues. Accordingly, the Contract Documents will incorporate requirements of these funding programs including, but not limited to, the higher of Oregon state or federal prevailing wages to be paid, certified payroll requirements, good-faith efforts to engage disadvantaged businesses, methods of procurement, and American Iron and Steel requirements. All contractors entering into prime contract with City will be required to have a valid Unique Entity ID number and System of Award Management (SAM) registration. No Bid will be received or considered by Owner unless the Bid contains, or is accompanied by, a statement by Bidder that Bidder accepts prevailing wage rate provisions required by ORS279C.800- ORS279C.870 and 40 USC 276a. For information concerning the proposed Work, contact Dave Anderson, Public Works Director, (541) 506-2008 (office), (541) 980-1446 (cell). The construction site is expected to be inaccessible for wheeled motor vehicles during the bid period due to snowpack. Note that the video of the pipeline corridor was obtained in Fall 2021 and has been made available via a link on the City webpage by clicking through the project title DOG RIVER PIPELINE PROJECTS. Owners right is reserved to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents.

Award

Water / Sewer

$2,464,430.00

Public - City

Site Work

53

33

2

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
18
Bidding Soon
346
All Active Projects
139
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2022

February 13, 2023

img_map_placeholder

Multiple Locations, The Dalles, OR


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.