BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2022 at 7:00 PM

Updated January 25, 2024

Site work for a water / sewer project in Salem, Utah. Completed plans call for site work for a water / sewer project.

From experienced contractors to complete the replacement of Maple Canyon Well Pump. The work for MAPLE CANYON WELL PUMP REPLACEMENT PROJECT, 2022 in general, consists of providing materials and labor to remove existing pump, brush and bail the existing casing, install the new pump including column piping, line shaft and sounder tube. The work must be completed this winter with the well being down for a minimal time.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
64
Bidding Soon
848
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2022

January 9, 2023

Project location map

To Be Determined, Salem, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.