BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2022 at 8:00 PM

Updated January 25, 2024

Site work and paving for a road / highway in Salem, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

PN-201813 Utah County is seeking to enter into an agreement with a qualified and motivated Construction Manager/General Contractor (CM/GC) firm to provide Construction Manager/General Contractor services to assist the County and the County's contracted Engineers (Project Engineering Consultants - PEC) to finalize design and construct the Loafer Mountain Parkway project. The project will construct a new roadway providing improved connection for the cities of Salem and Elk Ridge to SR-164, improving the access to I-15. The project will construct a new roadway providing improved connection for the cities of Salem and Elk Ridge to SR-164, improving the access to I-15. The main elements of the project consist of the following construction activities: 1. Construct a new 3-lane road (Loafer Mountain Parkway) between SR-164 and SR198 (approximately 2.75 miles). 2. Extend 400 North to intersect with Loafer Mountain Parkway (approximately .30 miles). 3. Improve, with minor widening, SR-164 from the new intersection with Loafer Mountain Parkway to the I-15 interchange (approximately .58 miles). 4. Install a signal at the intersection of SR-164 and Loafer Mountain Parkway. 5. Improve the intersection at SR-198 including the installation of a signal. 6. Reconstruct and widen Elk Ridge Drive from SR-198 to 11200 South (approximately 1.5 miles) including a realignment of Salem Canal Road (approximately .25 miles). 7. Install drainage features including trunk lines, roadside ditches, retention/detention ponds, and irrigation ditches and roadway crossings at multiple locations. 8. Install one 4-sided box culvert (16' x 6' x 120') carrying Loafer Mountain Parkway across Beer Creek, one 3-sided box culvert (12' x 5' x 104') within the wetland mitigation site, and a pedestrian box culvert (12' x 10' x 165') under the intersection of Salem Canal Road. 9. Construction of a wetland mitigation site (approximately 20 acres). 10. Install all fences, gates, driveways, utility connections, and other features as defined in the plans. October 4, 2022 Final Date to Submit Questions Question Submission Close Date 10/4/2022 5:00 PM MDT

Award

Roads / Highways

$200,000.00

Public - County

Paving, Site Work

5

19

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
57
Bidding Soon
848
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2022

February 13, 2023

Project location map

Elk Ridge Drive and Interstate15, northwest, Salem, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.