EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 2, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Framingham, Massachusetts. Completed plans call for the renovation of a educational facility.

The City of Framingham, through the Mayor of Framingham Massachusetts, the Awarding Authority invites sealed bids to the McCarthy HVAC installation project. This will include upgrades to the existing ventilation system using new heat pump technology for heating and cool throughout the building and include adding multiple rooftop condensing units. 1. Demolition as indicated on the plans. 2. Core drilling, cutting and channeling for holes five (5) inches and less in diameter. 3. Installation of all Equipment and Systems indicated in the contract documents, including, but not limited to: a. Raceway and conductors for power. b. Addition or modification of existing electrical distribution equipment including panelboards, distribution panelboards, switchboards, MCC(s), etc. c. Installation of mechanical power wiring and final connections to mechanical equipment. d. Installation of conduit, junction boxes, pull boxes, etc. e. Grounding of all equipment as required by code and as specified. f. Maintenance and proper operation of existing base building systems within the contract area in accordance with the requirements of the Owner and building management. 4. Cutting, channeling and chasing required to accommodate the electrical installation and rough patching. 5. Fire stopping. 6. Temporary light and power during construction. 7. Testing of electrical systems and equipment in accordance with manufacturer recommendations. 8. As-Built drawings.

Bid Results

Educational

$45,000.00

Public - City

Renovation

13

8

18

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Asbestos Remediation
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Accessories, Manufactured Curbs, Fire and Smoke Protection, Firestopping
Division 13 - Special Construction

Division 13 - Special Construction

Special Purpose Rooms, Controlled Environment Rooms, Clean Rooms
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
422
Active Projects
261
Bidding Soon
3,266
All Active Projects
1,513
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

June 28, 2023

img_map_placeholder

8 Flagg Dr, Framingham, MA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

McCarthy HVAC Installation - Sub Bid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.