Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Remodeling and renovation of a bridge / tunnel in Dover, Ohio. Conceptual plans call for the remodel of a bridge / tunnel; and for the renovation of a bridge / tunnel.
The Tuscarawas County Board of Commissioners intends to contract for Architectural/Engineering ser-vices in connection with the design and construction of the renovation/reconstruction of two County-owned buildings. Project A is for the Norma Johnson Center Red Barn Project Phase 1 (Safety and Preservation Improvements to the Building) located at 3645 Conservation Drive NW, Dover, OH 44622. Project B is for the Brandywine Center Project (renovation/remodeling and improvements to the building) located at 4820 Old Route #39 NW, Dover OH 44622 Statements of qualifications should include information regarding the firm's history, education and experience of the owner's & key technical personnel; the technical expertise of the firm's current staff; the firm's experience in designing similar projects; *the firm's experience in working with Federally funded projects; availability of staff; the firm's equipment & facilities; references; and any previous work performed for the Tuscarawas County Board of Commissioners. A more extensive scope of services and the evaluation criteria that will be utilized by the County in our review of all responses will be made available upon request. The preliminary project descriptions are as follows: Project Category: Project A-The Norma Johnson Center Red Barn Project = Project will address both safety and preservation needs at the Barn. Project must 1.) Address safety concerns and ensure the longevity of the structure. 2.) Correct the building lean and repair corner posts. 3.) Seal the structure from animal, insect and water penetrations. 4.) Replace flooring as needed (sand and seal to prevent trip hazards). 5.) Remove any non-original or incorrect fixes from the structure. 6.) Create ADA approved access to the structure. 7.) Add a finished concrete floor to the lower-level. Project B-The Brandywine Center Project = Project will renovate and remodel the current building to facilitate the following changes: 1.) Building needs to be ADA compliant (for use by County employees and the general public). 2.) Office Space in the building needs to accommodate approximately 5 staff people and on an intermittent basis meeting space for up to 20 visitors-may be somewhat open concept but with distinctly defined areas. 3.) There should be a small ADA Compliant restroom added to the first-floor. 4.) The building s main entrance needs to be revised and the front addition that is in the ROW needs to be removed. 5.) Replacement of existing windows and the addition of more windows should be considered. 6.) Heating and cooling options need addressed. 7.) A small kitchenette/serving kitchen should be added to the main level (sink, refrigerator, microwave, toaster oven, coffee maker, etc ). 7.) Electrical and lighting modifications/upgrades. 8.) Lower-level restroom renovations ADA compliance. 9.) Replacement of lower steps and installation of a chair-lift. 10.) Pour cement flooring in crawl space. 11.) Interior drywall and trim addressed. 12.) Replace drop-in ceiling where necessary. 13.) Provide opinion of probable costs for an exterior re-fresh and a new water well. Description: Architectural/Engineering, Design, Inspection & Construction oversight of the new County facilities projects. Total Project Budget (Including studies, design, construction, etc.) by project: Project A and Project B). Source(s) of Funding: (ARPA) American Rescue Plan Act of 2021. Projects Schedules: Anticipated dates for design startup/completion = October December 2022/ January 2023 Anticipated dates for construction/completion = April 2023/November 2023 Tuscarawas County is an Equal Opportunity/Affirmative Action Employer. The method of Contractor Selection has not been Determined at this time.
Conceptual
Bridges / Tunnels
$977,761.00
Public - County
Remodeling, Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2023
4820 Old Rte 39 NW, Dover, OH
Related To This Project
Dover, OH
Bid Date: Apr 19 2022
Dover, OH
Bid Date: Apr 22 2022
Dover, OH
Bid Date: May 17 2022
Dover, OH
Bid Date: May 03 2022
Dover, OH
Bid Date: Aug 10 2022
Dover, OH
Bid Date: Aug 10 2022
Dover, OH
Bid Date: Oct 10 2022
Dover, OH
Bid Date: Sep 07 2022
Toledo, OH
Bid Date: Nov 22 2022
Hillsboro, OH
--
Cleveland, OH
--
Dayton, OH
--
Columbus, OH
Bid Date: Feb 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.