BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Maryville, Tennessee. Completed plans call for the demolition of a residential development; and for site work for a residential development.

This bid shall include the removal of all structures, foundations, and surface concrete located at 807 Short Street in Maryville, Tennessee and removal of the concrete bridge located at the edge of the property. Foundation walls of dwelling should be taken down to 1 foot below existing elevation and filled and compacted with appropriate material such as clay. Bridge abutments may remain, but the pier in the center of the bridge shall be removed along with the handrail. Finish grade of the property after demolition shall maintain existing drainage pattern of property. Any materials inside the house will be considered a part of the demolition. All materials must be removed to an approved landfill. Care must be taken to keep demolition materials out of the adjoining creek. Removal of structures must be completed within 60 days of notice to proceed. The Contractor shall assume full responsibility for damage to City property caused by the Contractor's employees or equipment as determined by designated City personnel.The Contractor shall be solely responsible for the safety of the Contractor's employees and others relative to the Contractor's work, work procedures, material, equipment, transportation, signage and related activities and equipment.The Contractor shall possess and keep in force all licenses required to perform the services of this Agreement.Contractor shall obtain all necessary permits and pay all fees pertaining thereto as required to commencing work. Contractor must specify on the permit application the exact location to be used for dumping the remains of the demolition. If you have any questions regarding the technical specifications of this bid, please contact David Morton, City of Maryville Purchasing Agent, at (865) 273-3460 or by email at dhmorton@maryville-tn.gov. The demolition of the above-described property shall be completed within 60 days of commencement of work as approved by City of Maryville inspectors. At day 61, the penalty for any delay will be $100.00 per day for every day thereafter that the project is not completed

Post-Bid

Residential Subdivision

$200,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
98
Bidding Soon
889
All Active Projects
394
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 23, 2022

December 23, 2022

February 21, 2023

img_map_placeholder

807 Short St, Maryville, TN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.