Published January 30, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Stoughton, Massachusetts. Completed plans call for site work for a water / sewer project.

As of January 30, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The Work under this Contract includes, but is not necessarily limited to, the installation of approximately 7,000 feet of new water main on Knowles Avenue, Cammile Avenue, Henry Street, Coppcrwood Drive, Greenbrook Drive, and Prospect Street in Stoughton, MA to replace existing cast iron and asbestos cement water mains including all services, valves, hydrants, fittings, and other appurtenances. Construction must be complete 180 calendar days from and including issuance of a Notice to Proceed, and/or receipt offully executed contract, excluding final paving. Contract payment will be by the unit price method and the lump sum price method as indicated on the Bid Proposal. No Bidder may withdraw his/her Bid for a period of thirty (30) calendar days after the actual date ofthe opening ofthe Bids. Bidders shall certify that they do not, and will not, maintain or provide for their employees any facility that is segregated on a basis of race, color, creed, sex, national origin, or sexual preference. The bidding and award of the Contract shall be in full compliance with Sections 39M inclusive of Chapter 30 of the General Laws of the Commonwealth of Massachusetts as last revised. This project shall also comply with Sections 39F, 39K, 39N, and 390 of Chapter 30 of the General Laws ofthe Commonwealth ofMassachusetts as last revised. Each bid shall also be accompanied by a bid security in the form of a certified, treasurer's or cashier's check, bid bond, or cash in the amount of 5 percent ofthe value ofthe Bid. Minimum wage rates as determined by the Commissioner of Department of Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Sections 26 to 27G, as amended apply to this project, as contained in Appendix A of the Contract Documents. It is the responsibility of the Contractor, before bid opening, to request, if necessary, any additional information on the Minimum Wage Rates for those trade people who may be employed for the proposed work under this contract. The successful Bidder must furnish 100 percent (100%) Construction Performance Bond and 100 percent (100%) Construction Payment Bond. The Owner reserves the right to omit part or whole of any proposed work to be performed, as described in the Contract Documents, as may be required to maintain the total cost of work within available funds. The Owner reserves the right to waive any informality and to reject any or all Bids if deemed to be in the best interest ofthe Town of Stoughton.

Bid Results

Water / Sewer

$1,617,900.00

Public - City

Site Work

13

12

2

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Construction Progress Documentation, Scheduling of Work, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections, Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
152
Bidding Soon
2,749
All Active Projects
1,176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2022

January 9, 2023

img_map_placeholder

Multiple Locations, Stoughton, MA