BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Richmond, Kentucky. Completed plans call for the renovation of a educational facility.

Eastern Kentucky University ("Owner") is soliciting proposals for our Heat Plant Roof project at our main campus. The scope of the project is outlined in the following information including all attachments. Alternate No. 1 Shall consist of painting of Rooms and/or Items as shown on the Room Finish Schedule and identified as Alternate No. 1 Painting. Bid bonds as well as Payment & Performance bonds are required for this project. Additional information attached in the document titled Article 15 under the "Buyer Attachments" tab of this solicitation. When submitting your proposal, please upload your bid bond under the "Supplier Attachments" tab. Substantial and Beneficial Completion of each Phase of the work shall be within the following number of calendar days after issuance of the Written Purchase Order. TIME IS OF THE ESSENCE to achieve Beneficial Completion of each Phase A and B. Phase A shall be achieved within One-Hundred Eighty (180) calendar days after the issuance of a Written Purchase Order. Phase B shall be achieved within Two-Hundred Forty (240) calendar days after the issuance of a Written Purchase Order. Substantial Completion shall be achieved within Two-Hundred Eighty-Five (285) calendar days after the issuance of a Written Purchase Order. Final Completion shall be within Thirty (30) calendar days after the Date of Substantial Completion. LIQUIDATED DAMAGES shall be subject to the terms 36 of the General Conditions and, as more specifically, described as follows: If the work described as "Phase A" is not beneficially complete within the time required in Article No. 4 of these Special Conditions, the Contractor shall pay to the Owner, as liquidated damages for delay and not as a penalty, the sum of Two-Thousand dollars ($2000.00) for every day after the date for Beneficial Completion until construction for Phase A is in fact beneficially complete. If the work described as "Phase B" is not beneficially complete within the time required in Article No. 4 of these Special Conditions, the Contractor shall pay to the Owner, as liquidated damages for delay and not as a penalty, the sum of Two-Thousand dollars ($2000.00) for every day after the date for Beneficial Completion until construction for Phase B is in fact beneficially complete. Questions Due By: 12/13/2023 no later than 2:00PM (ET) - Submit via the Q&A Board in Jaggaer within this electronic solicitation event.

Post-Bid

Educational

$200,000.00

Public - State/Provincial

Renovation

44

24

19

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
41
Bidding Soon
508
All Active Projects
208
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

February 12, 2024

img_map_placeholder

521 Lancaster Ave, Richmond, KY

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.