BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Fresno, California. Contact the soliciting agency for additional information.

Contractor will provide office moving services, which shall include a full range of services: furniture installation, to remove the office furniture, equipment and related supplies from existing location, transport items to the new location and replace them according to the direction of the DOR Contract Administrator on an as needed basis. The contractor shall provide the following services under this agreement on an as-needed basis and subject to the dates of actual moving services provided by Contractor as follows: a. Labor, equipment, and materials to perform various office move related services including packing, moving, transportation/delivery, and unpacking and move management. b. Labor and equipment to perform various disassembly and reassembly of modular furniture including reconfiguration, moves, adds and changes. c. All sensitive equipment shall be pad-wrapped. This is to include electrical as well as computers, printers, etc. d. Storage of property in a secured location as required. e. Removal of surplus property to an appropriate location as needed. f. Removal of packing materials, rubbish, and debris from government premises as directed. g. Removal of transportation of hazardous materials is not included in this agreement. Removal of these substances is regulated under the Governors Office of Emergency Services and the California Environmental Protection Agency. a. Response to request for services may require Contractor to conduct a visual inspection of goods to be moved or disposed. b. The price on the bid will be the not to exceed price. All prices must reflect or be lower than the. c. All hourly and mileage rated costs indicated in this agreement shall not include third party or extra charges such as, parking fees, fuel surcharges, bond fees, rental equipment, and other moving related expenses the DOR may request. These costs, excluding fuel surcharges, bridge tolls, and parking fees, shall be on a pass-through basis only. Documentation must be submitted to support any of these charges to receive payment. d. Contractors shall itemize the above charges on the response to IFB for DOR approval prior to contract on-going contract request. Equipment rental (such as library and computer carts) is limited to specialized needs required by the DOR and must be agreed to prior to contract award by the DOR. e. Offers for move more than 100 miles (line haul) shall use the mileage rated and must have prior approval from DOR. All others shall use the hourly rates. State General Prevailing Wage Rates will apply for all counties where service is requested and continue for the duration of this Agreement. The predetermined general prevailing wage rates published by the Director of the Department of Industrial Relations may be obtained via the internet at www.dir.ca.gov. It is the Bidders responsibility to use the correct classification determination as published by the Department of Industrial Relations. Bidder must submit a certified copy of all payroll records for verification by the DOR Contract Administrator and/or designee with each invoice.

Post-Bid

Municipal

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
27
Bidding Soon
399
All Active Projects
169
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2022

January 6, 2023

img_map_placeholder

Multiple Locations, Fresno, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.