This is a service / maintenance or supply contract in Tazewell, Virginia. Contact the soliciting agency for additional information.

For the following tasks to be completed for Upper Clinch River Dam #8 (Lincolnshire Dam): 1. Virginia PMP Worksheet - Provide a Virginia 2015 Probable Maximum Precipitation (PMP) watershed calculation spreadsheet and certification using DCR Form 199-236 (if applicable) in accordance with the provisions of DCR guidance documents DCR-VSWCB-037 and 038. To be completed by January 13, 2023. 2. Emergency Action Plan (EAP) - Provide a revised/updated emergency plan in accordance with the provisions of Section 4VAC50-20-105(C)(3) and Sections 4VAC50-20-175 of the Virginia Impounding Structure Regulations. (Note: Please provide the EAP through the DCR Dam Safety Inventory System (DSIS) and/or electronic copy as required.) To be completed by February 28, 2023. 3. Table-Top Exercise - Conduct an emergency plan table-top functional exercise in accordance with the to-be-submitted Emergency Action Plan (EAP) and in accordance with the provisions of Section 4VAC50-20-175(E) of the Virginia Impounding Structure Regulations. To be completed by April 30, 2023. 4. Preliminary Engineering Report - Submit a technical report detailing plans for improving the spillway capacity to meet current regulatory requirements. Note: If the PMP Worksheet demonstrates that the existing spillway capacity is capable of passing a 0.9 PMP event, this report will not be necessary. To be completed by August 31, 2023. 5. Annual Inspection Report by Owner - Provide an annual inspection report by owner, using the DCR Dam Safety Inventory System (DSIS) and/or DCR Form 199-098, in accordance with the provisions of Sections 4VAC50-20-105(C)(2) and (E) and 4VAC50-20-180 of the Virginia Impounding Structure Regulations. To be completed by December 31, 2023. 6. Alteration Permit - Submit for an Alterations Permit for the needed spillway improvements in accordance with the provision of Sections 4VAC50-20-60 and 4VAC50-20-80 of the Virginia Impounding Structure Regulations. Note: If the PMP Worksheet demonstrates that the existing spillway capacity is capable of passing a 0.9 PMP event, this report will not be necessary. To be completed by December 31, 2023. 7. Annual Drill - Conduct an annual drill in accordance with the to-be-submitted approved Emergency Action Plan (EAP) and in accordance with the provisions of Section 4VAC50-20-175(E) of the Virginia Impounding Structure Regulations. To be completed by March 31, 2024. The due dates at the end of each task above are for DCR. All tasks must be completed two weeks prior to the due date and submitted to the Town Manager for review. The contract to complete tasks required annually will be awarded for five (5) consecutive years. For more information contact Todd Day at Town Hall at (276) 988-2501. The Town reserves the right to reject any and all bids. The method of Contractor Selection has not been determined at this time.

Conceptual

Water / Sewer

$400,000.00

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
23
Bidding Soon
351
All Active Projects
152
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.