BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a bridge / tunnel in Sandstone, Minnesota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.

County : Pine In Pine County on TH 35 from 1 Mile South of TH 48 to 2.2 Miles North of TH 48 Additional Description: DBE 13.5 5880-199 (TH 35 = 001) NHPP I350(138) In Pine County on TH 35 from 1 Mile South of TH 48 to 2.2 Miles North of TH 48 Grading, Unbonded Concrete Overlay, Concrete and Bituminous Paving, High Tension Cable Guardrail, Lighting, TMS, and Bridge Nos. 9785, 58827, 58828, 58829, 58830 3.181 Miles Grading, Unbonded Concrete Overlay, Concrete and Bituminous Paving, High Tension Cable Guardrail, Lighting, TMS, and Bridge Nos. 9785, 58827, 58828, 58829, 58830 MNDOT: Item 296 - Grading, Unbonded Concrete Overlay, Concrete and Bituminous Paving, High Tension Cable Guardrail, Lighting, TMS, and Bridge Nos. 9785, 58827, 58828, 58829, 58830 3.181 Miles The workforce participation goals for this Project are: Minority: 15% Women: 12%

Award

Bridges / Tunnels

$27,849,793.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

597

8

12

8

Subscribe For Documents

111 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
31
Bidding Soon
718
All Active Projects
253
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 27, 2023

January 2, 2024

July 1, 2026

img_map_placeholder

TH 35, Sandstone, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.