BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 24, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Spiro, Oklahoma. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; bridge / tunnel; road / highway; and road / highway.

This Recreational Trail Program (RTP)-fundedproject consists of the construction of approximately 3,635' of 8'-wide asphalt trails to the immediate east/northeast of Old Spiro Lake. The project consists of tree removal and the construction of a custom concrete trail flume/culvert with pipe railing, asphalt trails, concrete bench pads with benches, two (2)concrete handicap parking spaces, a 5'-wide concrete connector sidewalk, and the installation of two (2) galvanized corrugated steel arch pipes with end sections. Includes tree removal, grading, drainage, paving, signage, and striping work. General description of the project: This Recreational Trail Program (RTP)-funded project consists of the construction of approximately 3,635' of 8'-wide asphalt trails to the immediate east/northeast of Old Spiro Lake. The project consists of tree removal and the construction of a custom concrete trail flume/culvert with pipe railing, asphalt trails, concrete bench pads with benches, two (2) concrete handicap parking spaces, a 5'-wide concrete connector sidewalk, and the installation of two (2) galvanized corrugated steel arch pipes with end sections. Includes tree removal, grading, drainage, paving, signage, and striping work. This is the second bid for the project. The plans have been altered to include a reduction in the base bid and the creation of 2 additive alternates (listed below) and 2 alternates allowing the construction of concrete instead of asphalt trails. The additive alternates include: Additive Alternate #1- Purchase and installation of (6) Benches; and Additive Alternate #2 - Construction of Alignment #2 in the plans. OPTIONAL alternate #3 (included in Addendum #1) includes replacing the asphalt trail with concrete trail in the base bid. OPTIONAL alternate #4 (included in Addendum #1) includes replacing the asphalt trail with concrete trail in the Additive Alternate #2 portion of the project.

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

3

15

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
76
Bidding Soon
854
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2023

May 1, 2023

Project location map

Multiple Locations, Spiro, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.