Published January 25, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Fitchburg, Wisconsin. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

In general the work consists of: Remove existing silo and install new concrete sidewalk, stairs, fencing and basketball court. Work will include grading, concrete, fencing, storm sewer, and landscaping. All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Sealed bids will be received as follows, before the time indicated above: PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method); US Mail or Third-party delivery (UPS, Fedex, or DHL) to State of Wisconsin, Administration Building, 7 th 25 Floor, 101 East Wilson Street, Madison, Wisconsin 53703 The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Award

Sidewalks / Parking Lot

$263,362.00

Public - State/Provincial

Paving, Site Work

15

13

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Low-Voltage Electrical Distribution, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Soil Reinforcement, Geosynthetic Soil Reinforcement, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Special Foundations
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Retaining Walls, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists, Derricks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
81
Bidding Soon
1,264
All Active Projects
474
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2023

February 10, 2023

img_map_placeholder

To Be Determined, Fitchburg, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.