Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and addition to a transportation facility in Sacramento, California. Completed plans call for the addition of a transportation facility; and for site work for a transportation facility.
As of September 6, 2024, this project is now under construction. Interested parties who wish to get involved with this or future projects are encouraged to visit: https://www.balfourbeattyus.com/trade-partners/partner-with-us. As of June 20, 2024, project is scheduled to start construction third quarter 2024 and open fall 2025. As of October 30, 2023, this project is in schematic design. A construction manager at risk has been selected. A bidding and construction date have not been established at this time. Construction completion is anticipated for late 2025 Project consists of an improved, ADA compliant, walkway for all visitors between Terminal B and Concourse B. From earlier solicitation: The County of Sacramento (County) is the owner and operator of Sacramento International Airport, hereinafter referred to as "SMF". The Sacramento County Department of Airports (Department) will be embarking on a large capital program to improve operational function of terminal areas and accommodate increased gate operations. The addition of a new pedestrian walkway connecting Terminal B to Concourse B and Terminal/Concourse expansions are examples of several projects that may become part of the program of services. The Department is soliciting Statements of Qualifications and Experience (SOQ&E) from qualified Architectural and Engineering Designer of Record firms (DOR) to provide design and technical support services during construction for the project, which the Department intends to use Construction Manager at Risk (CMAR) as the delivery method. The DOR will be providing the following basic design services: A. Architectural B. Civil C. Structural D. Mechanical, Electrical and Plumbing E. Airfield design Additional consulting services may be needed depending on the scope of work for each project and can include the following: A. Fire Protection B. Low Voltage Systems (Telecommunication, Closed Circuit Television, Security and the like) C. Signage and Wayfinding Conveying Systems (Elevators, Escalators, Moving Sidewalks) D. Baggage Make Up and Baggage Handling Systems E. Passenger Loading Bridges Specific project scopes will include design services, technical and coordination support services during solicitation and selection of the CMAR, collaboration and coordination with CMAR during design and during CMAR's pre-construction services, and contract administration and technical support during construction. Separate task orders identifying detailed scope of work will be created for each of the major projects described further in this document.
Under Construction
Transportation Terminals
$140,000,000.00
Public - County
Addition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2024
Multiple Locations, Sacramento, CA
Related To This Project
Sacramento, CA
Bid Date: Aug 17 2022
Sacramento, CA
Bid Date: Sep 01 2022
Sacramento, CA
Bid Date: Aug 24 2022
Sacramento, CA
Bid Date: Apr 18 2022
Sacramento, CA
--
Sacramento, CA
Bid Date: Dec 02 2020
Sacramento, CA
Bid Date: Aug 10 2022
Sacramento, CA
Bid Date: Feb 08 2023
Sacramento, CA
Bid Date: Jan 27 2023
Sacramento, CA
Bid Date: Feb 03 2023
Sacramento, CA
Bid Date: Dec 20 2022
Sacramento, CA
Bid Date: May 24 2023
Sacramento, CA
Bid Date: Aug 12 2022
Sacramento, CA
Bid Date: Sep 02 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.