Site work for a water / sewer project in Pendleton, Oregon. Conceptual plans call for site work for a water / sewer project.
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR), Department of Natural Resources Water Resources Program is currently requesting proposals for the design of water efficiency improvements on the Ford and Crockett branches of the Little Walla Walla irrigation canal (Attachment A). The location of the project site is 1 mile north-northwest of Milton-Freewater, Oregon. The implementation of this project will improve in-stream flows for Endangered Species Act (ESA)-listed and non-ESA-listed native fish species in the Walla Walla River downstream from the Little Walla Walla point of diversion, while also providing irrigation water to the agricultural areas served by the Walla Walla River Irrigation District. Ultimately, the products from this design effort are expected to lead to the construction of improvements that will result in protected instream water rights at the Little Walla Walla River point of diversion on the south end of Milton-Freewater, Oregon. Improving instream flows for fisheries is a high priority for the CTUIR, as this will assist in increasing water quantity, as well as improving water quality, fish passage and associated habitat - concepts described in more detail in the Umatilla River Vision (Jones et al. 2008). This Request for Proposals ("RFP") provides the specific services to be contracted as well as information concerning the preparation and submittal of proposals, an explanation of how proposals will be evaluated, and terms and conditions of the contract that may be awarded as a result of the RFP. The products from this contract should include development of a complete design surface for the Little Walla Walla canal project area including channel profiles and ground based topographic survey, and any additional available data, capable of supporting a design for construction. Deliverables will include: topographic survey data, specification drawings (>=90% design), schematics, detailed project design and supporting analyses, and representations of canal alterations. The contractor will be expected to review, analyze and incorporate existing data and collect other data as necessary for describing and predicting specific hydrologic conditions related to canal seepage and water delivery during the complete hydrologic cycle (March - January) (note the canal is dried annually in February for maintenance). The contractor will provide data and information necessary for environmental permitting, such as wetland determination/delineation and expected post-project changes, identification of extent of impact, amount of material to dispose offsite, staging areas, areas of existing right- of-way, and infrastructure (such as power lines, sewer, roads, etc.). Request for Clarification Deadline: January 18, 2023 Response to Clarification Deadline: January 23, 2023 Tentative Award Selection (est.): February 8, 2023 Contract Award (est.): February 24, 2023 Project Initiation (survey): March 1, 2023 Project Completion (design): January 31, 2024 The Project is planned to begin March 1, 2023. The project deliverables will be completed by January 31, 2024. The CTUIR may reject a particular Proposal or all Proposals upon finding that it is in the CTUIR's best interest to do so. The method of Contractor Selection has not been Determined at this time
Conceptual
Water / Sewer
$900,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2023
To Be Determined, Pendleton, OR
Related To This Project
Pendleton, OR
Bid Date: Mar 03 2022
Pendleton, OR
Bid Date: Apr 12 2022
Pendleton, OR
Bid Date: Apr 14 2022
Pendleton, OR
Bid Date: Mar 24 2022
Pendleton, OR
Bid Date: Apr 07 2022
Pendleton, OR
Bid Date: Apr 07 2022
Pendleton, OR
Bid Date: May 10 2022
Pendleton, OR
Bid Date: Apr 14 2022
Pendleton, OR
Bid Date: Mar 02 2023
Pendleton, OR
Bid Date: Jan 05 2023
Pendleton, OR
Bid Date: Jan 12 2023
Pendleton, OR
Bid Date: Dec 14 2022
Pendleton, OR
Bid Date: Dec 12 2022
Pendleton, OR
Bid Date: Sep 02 2022
Pendleton, OR
Bid Date: Oct 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find better projects. Build better bids. Win.
Sign up for instant access to Project Search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.