Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 6, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a stadium in Morehead, Kentucky. Completed plans call for site work for a stadium.

Please Note Morehead State University Will Be Closed December 19 - January 1, 2023. Any Questions Recevied During This Time Will Be Answered After the Holiday Break But No Later Than January 11, 2023. All Questions Will Be Answered via Addenda That Will Be Issued and Posted at Online. Furnish all labor, materials, tools and equipment necessary to remove and replace the current field at Morehead State University Jayne Stadium. Scope of work includes the installation of artificial grass as indicated on the drawings and as specified herein; including components and accessories required for a complete installation. Including, but not limited to: 1. Place and maintain temporary protection of adjacent surfaces as required for all work. 2. Demolition and legal disposal of the existing turf and infill system. 3. Fine grade existing suitable aggregate base as required to achieve required finish planarity of quarter inch over 10 feet. 4. Furnishing and installing new synthetic turf system. 5. Furnishing and installing field markings. 6. Providing field maintenance training. 7. Field to have: a. Midfield 4 color Eagle Head logo (33-5 x 35) b. White field border with blue coaches boxes c. Standard football markings d. Blue end zones with gold letters (EAGLES x 2) e. Media Lines A five percent (5%) Bid Bond or cashier's check must be included with bid to receive consideration if bid price exceeds forty thousand dollars ($40,000). A one-hundred percent (100%) Performance Bond will be required of the successful bidder, if the bid is in excess of twenty-five thousand dollars ($25,000). The Performance Bond must be issued and submitted to the Office of Procurement Services within ten (10) days after notice of award.

Award

Arenas / Stadiums

$502,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
106
Bidding Soon
1,376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2023

February 20, 2023

Project location map

111 Playforth Pl, Morehead, KY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed