EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 2, 2023 at 7:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Champaign, Illinois. Completed plans call for site work for a playground / park / athletic field.

**As of March 2, 2023, this project has been awarded to Stark Excavating in the amount of $346,585.64. Each bid must be accompanied by a Bid Bond, bank cashier's check, or properly certified check in the amount of $12,500 and Section 2.53. A Contract Bond in the total amount of 100% of the contract price with a corporate surety approved by the Owner will be required for the faithful performance of the contract. Project Description: Reconstruct storm sewer and water service pipes. Install site underdrains, area drains and permeable paver sidewalk. Regrade playground site. Install access sidewalk, perimeter concrete playground curb and base for playground surfaces. Cold mill and overlay the hot-mix asphalt play area pavement. The Contractor shall be required to provide certificates of insurance as indicated in the documents. The Contractor will be required to comply with all Federal, State and Municipal laws and regulations, including those related to discrimination, prevailing wage, safety, bidrigging, human rights, preferential employment of Illinois labor and equal opportunity employment. The Champaign Community Unit School District #4 reserves the right to reject any and all bids, to waive any formalities or inconsistencies in the bids, to reduce the scope of work to accommodate the project budget, to accept any proposals which it deems most favorable, or to continue the letting from time to time as deemed in the best interest of the Owner. Bids may be held by the Champaign Community Unit School District #4 for a period not to exceed 45 days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the contract. A Pre-Bid Conference will not be held for this project.

Award

Playgrounds / Parks / Athletic Fields

$346,586.00

Public - City

Site Work

18

9

3

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Flags and Banners, Flags
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Pruning, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
57
Bidding Soon
515
All Active Projects
279
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2023

March 6, 2023

img_map_placeholder

2201 Hallbeck Dr, Champaign, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Playground Area Improvements Barkstall Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.