Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 31, 2025 at 7:00 PM

Updated February 1, 2025

Renovation of a power facility in Edmundston, New Brunswick. Completed plans call for the renovation of a power facility.

Design/build services associated with the integration of a Distributed Energy Resources (DERs) to their current utility system to reduce the carbon footprint of the city. This includes 1 MWDC of solar energy that will be installed on the roof of the Centre Jean-Daigle, the University's sports pavilion (Pavillon Sportif) and the Edmundston Energy administrative building as well as 2 MWh of battery energy storage system (BESS). TIMELINE: Construction is underway as of late 2024.

Under Construction

Solar Power Generation

$8,000,000.00

Public - City

Renovation

8

24

78

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
20
Bidding Soon
214
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2023

January 1, 2025

Project location map

Ben-Martin Ave, Edmundston, NB

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed