BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Smyrna, Tennessee. Completed plans call for site work for a transportation facility; for paving for a transportation facility; water / sewer project; and for outdoor lighting for a transportation facility.

As of June 30, 2023 the project has not been awarded yet. As of 1/30/2023 all bids rejected over-budget. TDOT Aeronautics Division (TAD) Project No. 75-555-0772-22 ATKINS Project No. 100077112 The project involves reconstruction of the majority of the airport's 5,546 feet by 100 feet secondary runway, Runway 1-19, excluding only the area within the safety area of the airport's intersecting primary runway, Runway 14-32. Also included is the regrading of the Runway 1-19 safety area measuring 7,746 feet by 400 feet. Reconstruction of the pavement will include removal of 25-foot shoulder pavement along each side of the runway and reconstruction of the runways existing flexible and composite pavement sections with a new cement-stabilized, reclaimed base and asphalt mix pavement surface. Pavement reconstruction will include nearly 2,000 tons of cement for stabilization of the base, and over 13,000 tons of asphalt mix pavement surface material. Safety area improvements will steepen the transverse slopes away from the runway pavement and placement of this material in the extended safety areas beyond each runway end, requiring approximately 70,000 cubic yards of excavation to on-site embankments, over 40,000 cubic yards of topsoil stripping and spreading, adjustments to, and addition of storm drainage inlet structures along the airport's storm drainage collection system, relocation of 900 feet of two-lane airport service road, 1,670 feet of 14-foot-wide airport perimeter road, and 1,600 feet of 8-foot-wide golf course cart path. Airfield lighting improvements include replacement of the runway's medium intensity runway edge lighting circuit with 49 edge lights and 16 threshold lights, two lighted supplemental wind cones, new runway end identifier lights at each runway end, and 23 lighted airfield signs. Along with re-routing portions of circuits for four other lighting circuits on the airfield, a total of approximately 24,500 linear feet of direct buried duct will be installed with bare copper counterpoise wire and approximately 38,000 linear feet of airfield lighting cable will be installed. Other miscellaneous project elements include 670 feet of relocated underground single-phase primary power line, over 1,500 linear feet of golf course irrigation system modifications, over 83,000 square feet of airfield pavement markings, over 1,600 linear feet of perimeter security fence, and extensive erosion prevention and sediment control measures over the 93-acre site, with over 24,000 square yards of sod placement, and 74 acres of other disturbed area to receive temporary and permanent turf stabilization. Each proposal must be accompanied by a Bidder's Bond on the form contained in the Proposal from a Surety Company acceptable to the Smyrna/Rutherford County Airport Authority or a Cashier's Check or Certified Check made payable to the Smyrna/Rutherford County Airport Authority for not less than 5 percent of the total amount of the bid. A 100% Contract Bond will be required. The Smyrna/Rutherford County Airport Authority reserves the right to reject any and/or all bids, to waive any informalities and technicalities in the bids received and to accept any bid which, in its opinion, may be in the best interest of the Authority. Prospective bidders should read the instructions for preparing bids in the Project Specifications carefully before submitting their bids and must supply all the information required therein within the time limits specified. Bids are required to remain open for acceptance or rejection for a period of sixty (60) days after the bid opening. The bidder must have at his disposal the necessary equipment to put on the project when notice is given to begin work and to do the work within a time specified. The proposal of any bidder will be rejected if the award of the work for which the proposal is submitted may, in the judgement of the Smyrna/Rutherford County Airport Authority, affect the workmanship, financing or progress of other work awarded to the bidder in the same letting or other work which the bidder may have under contract. Award of this contract is contingent upon the availability of funds. The complete examination and understanding of the Plans and Specifications and the proposed work site is necessary in order for the bidder to properly submit a proposal. Time limit for completion of the work is as shown on the proposal. Liquidated damages for delay of completion of contract will be in accordance with the General Provisions of the Specifications. The successful bidder shall hold and save harmless the Smyrna/Rutherford County Airport Authority from liability in connection with patents. All bidders must be licensed contractors as required by the Contractor's Licensing Act of 1976, T.C.A. 62-6- 101, et.seq. The Contractor will be required to comply with the wage and labor requirements and to pay minimum wages in accordance with the schedule of wage rates as required by T.C.A., Title 12, Chapter 4, as amended, and in accordance with federal prevailing wage laws. p.No-AC 150/5370-10H, 75-555-0737-17 A bidder that has doubt as to the true meaning of a project requirement may submit to the Owner's Engineer a written request for interpretation no later than seven days prior to bid opening Question Deadline 05/09/2023

Bid Results

Transportation Terminals

$12,479,901.00

Public - County

Outdoor Lighting, Paving, Site Work

138

8

6

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
27
Bidding Soon
785
All Active Projects
340
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2023

June 15, 2023

img_map_placeholder

278 Doug Warpoole Rd, Smyrna, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.