Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 30, 2025 at 8:00 PM
Updated October 1, 2025
Site work and paving for a civil project in Edgewood, Washington. Design plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.
Failing infrastructure was identified through Citizen Action Requests and inspection in late 2018 / early 2019. During staff's investigation of the issues, the need for significant improvements became apparent from the affected neighborhood on 56th St E, down Edgewood Drive and Sumner Heights Drive, downstream into the City of Sumner. Due to the scope of improvements needed, this project has been elevated from the Spot Improvement Program to the Capital Improvement Program. This project will install necessary surface water conveyance improvements along the entire length of road described above, converting an existing ditch line along Edgewood Drive into a culvert, improving traffic safety with widened travel lanes and new curbing, and increasing the conveyance capacity of the culvert and ditch system along Sumner Heights Drive to its destination at West Valley Highway in the City of Sumner. The conveyance along West Valley Highway will also be improved, including replacement of an existing culvert at the end of its service life with an outfall into WSDOT right-of-way. As of September 30, 2025, this project is included in the City of Edgewood FY 2025-2030 Budget CIP. It is currently in the design phase with design being done in house. A timeline for construction has not yet been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Roads / Highways
$950,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2026
Edgewood Dr E & 56th St E, Edgewood, WA
Related To This Project
Edgewood, WA
--
Edgewood, WA
--
Edgewood, WA
Bid Date: May 20 2025
Edgewood, WA
--
Edgewood, WA
Bid Date: Sep 10 2025
Edgewood, WA
--
Edgewood, WA
--
Edgewood, WA
Bid Date: Apr 04 2024
Edgewood, WA
Bid Date: Sep 21 2021
Edgewood, WA
--
Edgewood, WA
Bid Date: Jul 19 2021
Edgewood, WA
Bid Date: Sep 20 2021
Edgewood, WA
Bid Date: Dec 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
