BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Site work and paving for a sidewalk / parking lot in Edgewood, Washington. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Construct non-motorized trail with paved surface and gravel shoulders along Puget Sound Electric Railway corridor linking disconnected segments of the regional Interurban Trail. County: Pierce Agency: Edgewood Length : 1.000 Begin Termini : 114th Avenue East End Termini : West Valley Highway East As of September 30 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. WADOT - Interurban Trail Phase III (Jovita Canyon) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$7,204,850.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
106
Bidding Soon
1,506
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

114th Ave E, Edgewood, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.