BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Edgewood, Washington. Conceptual plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

Failing infrastructure was identified through Citizen Action Requests and inspection in late 2018 / early 2019. During staff's investigation of the issues, the need for significant improvements became apparent from the affected neighborhood on 56th St E, down Edgewood Drive and Sumner Heights Drive, downstream into the City of Sumner. Due to the scope of improvements needed, this project has been elevated from the Spot Improvement Program to the Capital Improvement Program. This project will install necessary surface water conveyance improvements along the entire length of road described above, converting an existing ditch line along Edgewood Drive into a culvert, improving traffic safety with widened travel lanes and new curbing, and increasing the conveyance capacity of the culvert and ditch system along Sumner Heights Drive to its destination at West Valley Highway in the City of Sumner. The conveyance along West Valley Highway will also be improved, including replacement of an existing culvert at the end of its service life with an outfall into WSDOT right-of-way. As of October 3, 2024, this project is included in the City of Edgewood FY 2024-2029 Budget CIP. Further information regarding a design firm and timeline for construction has not yet been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$800,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
27
Bidding Soon
698
All Active Projects
299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

img_map_placeholder

Edgewood Dr E & 56th St E, Edgewood, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.